Laserfiche WebLink
ITEM 4.5. <br /> <br />Howard R, Green Gompany <br />QONSULTING ENGINEER8 <br /> <br />June 23, 1997 <br />File: 230-000-00 <br /> <br />CONS[]LT[~G ENGINEER~ <br /> <br />Formerly MSA <br />Consulting Engineers <br /> <br />Mr. Pat Klaers <br />City Administrator <br />City of Elk River <br />13065 Orono Parkway <br />P.O. Box 490 <br />Elk River, MN 55330 <br /> <br />RE: <br /> <br />STATE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) <br />FISCAL YEARS 1998 THROUGH 2000 <br /> <br />Dear Mr. Klaers: <br /> <br />Last week, I attended the Region 7W Transportation Advisory Committee (TAC) meeting. At that <br />meeting, we reviewed the draft State Transportation Improvement Program (STIP) for fiscal years <br />1998 through 2000. There are several projects included in the draft STIP that would be of interest <br />to the City of Elk River. The purpose of this letter is to inform you of these projects included in the <br />STIP. <br /> <br />In fiscal year 1998, which runs from July 1, 1997, to June 30, 1998, there are several projects. <br />They are as follows: <br /> <br />CSAH 12 Upgrade from County Road 13 to the Anoka County line. This project is <br />estimated at $355,000 with $284,000 of federal funds. <br />The signal at Upland Avenue and TH 10. This project is estimated in the STIP at $300,000 <br />with $150,000 being local funds. <br />The left turn lane at Simonet Drive and TH 10. This project is estimated at $200,000 with <br />no local contribution. <br />The installation of continuous lighting and fencing on TH 169 from Jackson Avenue to Main <br />Street in Elk River. This project is estimated at $400,000 with no local contribution. <br />Installation of rubber surface at the railroad crossing at Jackson Street. This project is <br />estimated at $75,000 with $60,000 being federally funded and $15,000 being listed aS local <br />contribution. <br /> <br />There are no projects of interest to Elk River listed in fiscal year 1999. However, in fiscal year <br />2000, the pedestrian overpass over TH 169 in Elk River is listed. This project is estimated at <br />$492,000 with $393,600 being federal funds and $98,400 being local funds. <br /> <br />1326 Energy Park Drive · St. Paul, MN 55108 ° 612/644-4389 fax 612/644-9446 toll free 800/888-2923 <br /> <br /> <br />