My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7. PRSR 10-12-2005
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2001-2010
>
2005
>
10-12-2005
>
7. PRSR 10-12-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2011 10:47:13 AM
Creation date
2/3/2011 10:47:13 AM
Metadata
Fields
Template:
City Government
type
PRSR
date
10/12/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELK RIVER ARENA <br />1000 SCHOOL STREET <br />ELK RIVER, MN 55330 <br />(763) 635 - 1141 <br />FAX (763) 635 - 1144 <br />rczech(a,ci. elk-river.mn.us <br />To: Arena Commission Members <br />From: Rich Czech, Arena Manager <br />Date: October 5, 2005 <br />Subject: Arena Update <br />During the storm on September 12`" the roof over the Olympic rink sustained hail <br />damage. The damage is throughout the roof and has caused major leaking in the Olympic <br />rink. The insurance adjuster as well as a roofing consultant for the insurance company <br />have been out and have inspected the damage to the roof. The consultant for the <br />insurance company recommended to the insurance company a total replacement of the <br />roof. During this time the insurance company is receiving bids from four roofing <br />companies, as well as quotes from two cleaning companies to clean the interior walls that <br />have water stains on them from the roof leaks. It is yet to be determined if the walls will <br />need to be painted, once the quotes come in from the cleaning companies we should <br />know more. I would expect that even if they could get all the stains removed from the <br />walls, the paint where the walls were cleaned would be a different shade from the rest of <br />walls. <br />The city council adopted a resolution authorizing the emergency replacement or the repair <br />of the Arena roof. This allows the city to move forward on the replacement or the repair <br />of the roof without going through the cities bidding process, which would delay the <br />replacement by weeks. The resolution was also needed so that repairs could be made as <br />quickly as possible to avoid more damage to the interior of the building and to the ice in <br />the Olympic rink. <br />Once the city receives the final amount the insurance is willing to pay for the replacement <br />of the roof, the city will then have to determine what type of roof to install and a <br />contractor to install it. A final determination of the damages to the interior of the Arena <br />will not be decided until the roof is completed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.