My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.9. SR 06-16-1997
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1997
>
06/16/1997
>
6.9. SR 06-16-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:52 AM
Creation date
8/6/2003 5:36:47 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/16/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16.9. <br /> <br />Howard R. Green Company <br />CONSULTING ENGINEERS <br /> <br />June 11, 1997 <br />File: 230-277-30 <br /> <br />CONS[LTING <br /> <br />Formerly MSA <br />Consulting Engineers <br /> <br />Honorable Mayor and City Council <br />City of Elk River <br />13065 Orono Parkway <br />P.O. Box 490 <br />Elk River, MN 55330 <br /> <br />RE: <br /> <br />JOPLIN STREET/TH 10 SIGNALIZATION <br />CHANGE ORDER NO. 1 <br /> <br />Dear Council Members: <br /> <br />Attached for your consideration is Change Order No. 1 to the Joplin Street/TH 10 Signalization <br />project. This proposed change order consists of two items. One is a change to the wiring of the <br />warning flasher that is part of the signal system. This change in the wiring configuration was <br />requested by MnDOT. The second component of the change order is to add an Emergency <br />Vehicle Preemption (EVP) system to the signal installation. This is a system that will allow <br />emergency vehicles with emitters to change the signal to a green phase as they approach so they <br />will not have to cross the intersection under a red condition. <br /> <br />The total change order is in the amount of $5,118.30. Approximately $4,500 is the cost of the EVP <br />system and the remaining cost is for the change in the wiring. According to the Cooperative <br />Agreement with MnDOT concerning this signal installation, they should participate in half of the cost <br />associated with this change order. Once approved by the City, we will forward a copy to MnDOT <br />for their information. <br /> <br />If you have any questions regarding this issue, I will be in attendance at your June 16, 1997, City <br />Council meeting. <br /> <br />Sincerely, <br /> <br />HOWARD R. GREEN CONSULTING ENGINEERS <br /> <br />TJM:tw <br />Attachment <br /> <br />277-1108.jun <br /> <br />1326 Energy Park Drive · St. Paul, MN 55108 · 612/644-4389 fax 612/644-9446 toll free 800/888-2923 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.