My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.4. SR 01-18-2011
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2011
>
01-18-2011
>
3.4. SR 01-18-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2011 11:03:10 AM
Creation date
1/14/2011 11:03:09 AM
Metadata
Fields
Template:
City Government
type
SR
date
1/18/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UALITY FLOW SYSTE <br />800 6`" Street NW <br />New Prague, MN 56071 <br />January 5, 2011 <br />TO: City of Elk River <br />Attn: Gary Leirmoe <br />Subject: VWVfP Recycle Station <br />Engineer: BDM <br />Phone(952)758-9445 <br />Fax(952)758-9661 <br />Dear Gary; <br />Please find below our proposal to supply finro new pumps, control modifications, piping, and all required <br />labor for a complete project. <br />Recycle Pumas 8~ Control: <br />Two (2) "KSB" Sewabloc Model K150-315lGV, 15hp, 230/460/3, 6" heavy duty vertical non clog <br /> sewage pump capable of pumping 500 gpm @ 45' TDH. To include: <br /> - Pump stand/ 6" suction elbow <br /> - 15hp, 1160 rpm, TEFC 15hp, EPACT efficiency motor <br />Four (4) 6" plug valves <br />Two (2) 6" swing flex check valves <br />One (1) 6" piping to complete the piping of the two pumps to the suction header and discharge <br /> outlet of the building <br />One (1) Concrete work around the base of pumps <br />One (1) Control upgrade to include the following as a minimum: <br /> - (2) 15hp Mitsubishi Series 700 VFD's installed in the MCC <br /> - (2) Cooling fans in MCC compartments <br /> - (2) Feeder breaker buckets <br /> - (1) Color touch operator interface for mounting in the existing enclosure <br /> -All required electrical wiring, conduit, and materials <br /> - All required programming modifications as required <br />One (1) Installation, start-up and training. <br />One (1) Freight to the jobsite <br />Total Delivered Selling Price - -$74.460.00(+ tax) <br />(freight allowed to the jobsite) <br />Adder: <br />Add $13.870.00 (+ tax) to the above price if we install a complete new Allen Bradley 505 PLC and control <br />panel vs. utilizing the existing Allen Bradley 503 PLC and panel. <br />We prepared this based on the pump design conditions provided. In the event this changes we would need <br />to modify our proposal accordingly. If you have questions or wish for our proposal to be quoted different, <br />please give me a call. <br />INC. <br />Sincerely, <br />~at~ic~ /~a~a~ <br />Patrick Malay <br />
The URL can be used to link to this page
Your browser does not support the video tag.