My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5. ICESR 01-12-2011
ElkRiver
>
City Government
>
Boards and Commissions
>
Arena Commission
>
ICE Packets
>
2010-2019
>
2011
>
01-12-2011
>
5. ICESR 01-12-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2011 2:29:52 PM
Creation date
1/10/2011 1:42:44 PM
Metadata
Fields
Template:
City Government
type
ICESR
date
1/12/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Fee Proposal Z~2 <br />Design Group <br />Fee <br />292 proposes to complete the feasibility study outlined above for the lump-sum fee <br />of $10,000 including expenses. Should the City of Elk River elect to move forward <br />with the project and 292 is selected to complete the work, 50% of the $10,000 fee <br />($5,000) will be credited against the first invoice for design services. The 292 team <br />strives to tailor the fee structure to the client's expectations and requirements. <br />As always, we would appreciate the opportunity to discuss our fees and their <br />development with you. <br />Reimbursable Expenses -- In addition to the lump sum fee <br />Reimbursable expenses include but are not limited to the following: <br />• Cost of out-of-town travel, lodging and electronic communications in connection <br />with the project <br />• Transportation cost at current rates, including parking fees <br />• Reproductions, plots, standard form documents, photocopies, project <br />photography, postage, long-distance telephone calls, facsimiles, handling and <br />delivery of Instruments of Service <br />• Materials required to assemble reports. <br />• Printing. of construction bid sets <br />• Renderings, models and mock-ups requested by the owner <br />• Other similar direct project-related expenditures <br />Reimbursable expenses are billable at 10% over cost. <br />• <br />a <br />a <br />a <br />N <br />LL <br />C <br />N <br />Q <br />N <br />U <br />N <br />• C <br />W <br />
The URL can be used to link to this page
Your browser does not support the video tag.