My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5. ICESR 01-12-2011
ElkRiver
>
City Government
>
Boards and Commissions
>
Arena Commission
>
ICE Packets
>
2010-2019
>
2011
>
01-12-2011
>
5. ICESR 01-12-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2011 2:29:52 PM
Creation date
1/10/2011 1:42:44 PM
Metadata
Fields
Template:
City Government
type
ICESR
date
1/12/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.292's Project Process Z~2 <br />Design Group <br />5. Preliminary Cost Estimate <br />Once the conceptual designs are prepared, 292 will work with an experienced <br />and qualified construction cost estimator to provide preliminary budgets for each <br />of the options that were developed. Acost-benefit analysis can be generated and <br />recommendations made for a preferred option. The estimates maybe used to reliably <br />establish a budget for constructing and furnishing the project. <br />6. Final Report <br />The Conceptual Design Study process will conclude with the preparation of a final <br />report. 292 will assemble all data and other critical information into a comprehensive, <br />user-friendly document. This report will document the study process and serve as <br />an outline to help guide the ice rink planning, design, and construction, as well as <br />help define the economic parameters of the project. In addition to printed copies of <br />the study, 292 will provide an electronic version (PDF) that can be incorporated into <br />websites, e-newsletters, or other multimedia presentation to promote the projects <br />benefits to the community and to project's stakeholders. <br />7. Presentation of the Completed Feasibilty Study <br />The 292 team will present the completed Feasibility Study to the City of Elk River <br />and to other community stakeholders that are interested in the completed study. <br />r~ <br />~J <br />a <br />a <br />} <br />.~ <br />LL <br />C <br />N <br />Q <br />U <br />N <br />C <br />w <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.