Laserfiche WebLink
T----- <br />.,~~4 <br />Capital Improvement Plan 2011 ti„-u 2015 <br />City of Elk River, Minnesota <br />I Project# B)J-1O <br />' Project Name City Hail Solar TherlTtal Project <br />Tppe Improvement Department Public Buildings <br />Useful Life Unassigned Contact Building Maintenance Supv. <br />Catenor~~ Building Maintenance Priorih~ n''a <br />l,1Ty Was aWarQell a ~C:IlUUl 1J1SLi1C:lclIlU LUl:ill IJUVCiilillGill itGi1GW0.U1G L11Gly~' 1J1a111 ylv~iaui -ruu~r'~ ui ui~. <br />ant of $49,558. <br />The proposed prof ect would install 16 solar collectors to the south facing roof top of the City Hall building. The <br />system would then be piped into the second floor to a holding tank system with a series of pipes and pumps attached tc <br />a heat exchanger to circulate treated water and transfer heat to the existing heating system. <br />Justification <br />iThe project will allow the City to maintain building comfort levels while considerably lowering natural gas <br />;consumption and our carbon footprint. <br />Expenditures ZO11 2012 2013 2014 2015 Total <br />Construction/Maintenance 99,116 99,116 <br />Total 99,116 99,116 <br />Funding Sources 2011 2012 2013 2014 2015 Total <br />Federal Grants 49,558 49,558 <br />Government Buildings Reserve 49,558 49,558 <br />Total 99,116 99,116 <br />Page 42 <br />Description ' <br />