My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-16-1997 CC MIN
ElkRiver
>
City Government
>
City Council
>
Council Minutes
>
City Council 1974 - Present
>
1990-1999
>
1997
>
06-16-1997 CC MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:51 AM
Creation date
8/6/2003 1:21:03 PM
Metadata
Fields
Template:
City Government
type
CCM
date
6/16/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River City Council Meeting <br />June 16, 1997 <br /> <br />Page 9 <br /> <br />Mayor Duitsman opened the public hearing. There being no one for or against <br />the matter, Mayor Duitsman closed the public hearing. <br /> <br />Councilmember Thompson indicated he had a concern about the site line and <br />the need for a stop sign at the exit. He also indicated that two exits would <br />increase the traffic flow on County Road 33. <br /> <br />COUNCILMEMBER HOLMGREN MOVED TO APPROVE THE REQUEST FOR A <br />CONDITIONAL USE PERMIT BY CAMAS MN (SHIELY MASONRY) FOR THE EXPANSION <br />OF THEIR CONCRETE BLOCK PRODUCTION FACILITY WITH THE FOLLOWING <br />CONDITIONS: <br /> <br />SITE IMPROVEMENTS SHALL BE COMPLETED IN 3 PHASES AS SHOWN ON THE <br />PHASING PLAN. PHASE ONE SHALL BE COMPLETED BY JULY 1, 1998, PHASE 2 <br />BY JULY 1, 1999 AND PHASE 3 BY JULY 1, 2000. <br /> <br />2. LANDSCAPING WILL BE COMPLETED AS PART OF PHASE 1. <br /> <br />RIGHT TURNS LANES ARE REQUIRED AT THE EXISTING AND PROPOSED <br />ACCESSES UNLESS MODIFIED BY THE REDESIGN OF COUNTY ROAD 33. <br /> <br />THE EXTERIOR OF THE PROPOSED EXPANSION OF THE EXISTING BUILDING <br />AND THE PROPOSED NEW BLOCK PRODUCTION BUILDING WILL MATCH THE <br />EXTERIOR OF THE EXISTING BUILDING. <br /> <br />THE EAST ENTRANCE BE PAVED AND PROVIDED WITH CURB AND GUTTER. THE <br />CURB AND GuI'rER SHOULD BE CONTINUED BACK TO A LINE THAT IS <br />PARALLEL TO THE FRONT OF THE EXISTING BUILDING AND INCLUDE THE <br />CONNECTION WITH THE PLAISTED FACILITY. THE PAVING SHOULD BE <br />EXTENDED SO THAT IT CONNECTS WITH THE PAVED AREA CURRENTLY USED AS <br />EMPLOYEE PARKING AND INCLUDE THE AREA AROUND THE AGGREGATE <br />BINS IN THE SOUTHEAST CORNER OF THE SITE. <br /> <br />THE WEST ENTRANCE SHALL BE PAVED INCLUDING DRIVE AISLES TO THE <br />AGGREGATE BINS. CURB AND GUTTER SHALL BE CONTINUED FROM COUNTY <br />ROAD 33 BACK TO THE BEGINNING OF THE CURVE. <br /> <br />EXACT LOCATION OF THE SECOND ACCESS WILL BE VERIFIED AND <br />APPROVED BY SHERBURNE COUNTY HIGHWAY DEPARTMENT AND CITY OF <br />ELK RIVER. <br /> <br />o <br /> <br />A SITE PLAN WILL NEED TO BE SUBMITTED ILLUSTRATING THE NECESSARY <br />IMPROVEMENTS FOR STAFF REVIEW AND APPROVAL. <br /> <br />ALL IMPROVEMENTS BE MADE FROM THE PLANNED 100 FOOT RIGHT-OF-WAY <br />ALONG COUNTY ROAD 33. <br /> <br />10. TO INCLUDE A STOP SIGN AT THE ACCESS POINTS. <br /> <br />COUNCILMEMBER THOMPSON SECONDED THE MOTION. THE MOTION CARRIED 5-0. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.