My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.15. SR 05-19-1997
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1997
>
05/19/1997
>
6.15. SR 05-19-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:50 AM
Creation date
8/5/2003 8:48:36 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/19/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Antenna Tower Overlay District <br />March 25, 1997 <br /> <br /> b. <br /> C. <br /> <br />Page 9 <br /> <br />An application for a building permit, and <br />A report prepared by a qualified and licensed professional <br />engineer indicating the structure or tower's suitability to <br />accept the antenna, and the proposed method of affixing <br />antenna to the structure. Complete details of all fixtures <br />and couplings, and the precise point of attachment shall <br />be indicated. <br /> <br />O. Abandoned or unused Portions of Towers <br /> <br />Abandoned or unused towers or portions of towers and accompanying <br />accessory facilities shall be removed as follows: <br /> <br />All abandoned or unused towers and associated facilities shall be <br />removed within 12 months of the cessation of operations at the site <br />unless a time extension is approved by the City Council. In the event <br />that tower is not removed within 12 months of the cessation of <br />operations at the site, the tower and associated facilities may be <br />removed by the City and the costs of removal assessed against the <br />property. <br /> <br />Unused portions of towers above a manufactured connection shall be <br />removed within 6 months of the time of antenna relocation. 'The <br />replacement of portions of a tower previously removed requires the <br />issuance of a new conditional use permit. <br /> <br />Section 3. That this Ordinance shall take effect and be in full force from <br />and after the date of its publication. <br /> <br />Passed and adopted by the City Council of the City of Elk River this __ <br />of ., 1997. <br /> <br />day <br /> <br />ATTEST: <br /> <br />Henry A. Duitsman, Mayor <br /> <br />Sandra A. Thackeray, City Clerk <br /> <br />\\elkriver\sysXshrdocXplanning\scott\toweramd.doc <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.