Laserfiche WebLink
Sent by: DRB 6122919313; 05/12/97 19:11; JetiCalx #243;Page 32/39 <br /> <br /> ~ [831 Hydro_zeologic Reports, The investigation of the hydrological and <br />geophysical characteristics of the site shall be continued and any other new information relating to <br />the hydrogeologic impact of the site shall be reported to the City. Hydrogeologic reports shall be <br />updated, amended, and modified as warranted by newly discovered or additional data acquired in <br />the continued hydrogeologic investigation. The ?ermittee shall also notify City at least two (2) <br />days in advance of any soil boring or well construction required by this Permit. <br /> <br /> ~ [931 Dust; Noise; and Odor. Fugitive dust emissions off-site shall be controlled <br />at the Landfill Site as necessary by undertaking the following: road surfaces within the Landfill <br />Site shall be wetted with water or an appropriate chemical whenever off-site dust levels become <br />unreasonable as determined by the City Zoning Administrator. Dust pollutives shall be utilized to <br />the extent necessary on cover material such as stock piles to reduce wind erosion as well as on <br />other exposed surfaces as appropriate. Cover compaction and revegetation activities shall be <br />undertaken promptly on the completion of various fill areas and vegetative cover capable of quick <br />growth shall be utilized. Plantings of'bushes and trees shall be installed if' needed to buffer the <br />Landfill Site and minimize wind erosion. <br /> <br /> All equipment and vehicles utilized at the Landfill Site shall be periodically inspected and <br />maintained to minimize noise. Vegetative barriers along the boundaries of the Landfill Site shall <br />be utilized to minimize off-site noise impacts. Applicable state standards for noise pollution shall <br />not be exceeded by the Landfill operation, equipment, vehicles, or machinery, <br /> <br />The Perrnittee shall take reasonable actions to control odors from the Landfill Site. <br /> <br /> ~ f10,~1 Closure. Within six (6) months ora written demand by the City, but in no <br />event later than one (1) year prior to the date projected for cessation of landfill operations, the <br />Permittee shall submit to the City for approval an updated closure and post-closure plan for the <br />Landfill Site. <br /> <br /> ~ ri 1.1_.__] _Insurance. The Permittee shall secure and maintain insurance from an <br />insurance company acceptable to the City and authorized to write casualty insurance in the State <br />of Minnesota which will protect the Permittee, its agents and employees, and the City from claims <br />for bodily injury, death, or property damage which may arise from the operations on the Landfill <br />Site. The Permittee shall file a certificate of insurance or a certified copy of' the insurance policy <br />with the City. Such insurance policy shall contain a clause providing that it shall not be cancelled <br />by the insurance company without thirty (30) days' written notice to the City of intention to <br />cancel. The following coverages shall be provided in amounts not less than those specified: <br /> <br />(01) Public liability, general liability, loading and unloading, personal injury, and <br />property damage; <br /> <br />(a) $200,000 per claimant <br /> <br />Co) $600,000 per occurrence <br /> <br /> <br />