My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.2. SR 05-19-1997
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1997
>
05/19/1997
>
6.2. SR 05-19-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:50 AM
Creation date
8/5/2003 8:45:04 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/19/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sent by: DRB 6122919313; 05/12/97 19:01; J~ #243;Page 12/39 <br /> <br />(20) Safety Equipment. Emergency firsl aid equipment consisting ofat least one first <br />aid kit kept near the working face, and at least one shower on site available to all <br />personnel and customers shall be supplied. At least one of every four landfill personnel <br />shall be trained in first aid and CPR. <br /> <br />(21) Water. A potable water supply shall be available for site personnel. <br /> <br />(22) Storage, Adequate on-site shelter shall be provided for maintenance and storage, <br />sufficient to supply the equipment required by subsection (19) of this section, during cold <br />weather operations. <br /> <br />(23) Vehicle Stacking Facilities. Adequate vehicle stacking facilities shall be provided <br />to ensure that no vehicle desiring entry into the site shall have to wait outside the <br />perimeter of:he Landfill Property. <br /> <br />(24) .~. Adequate communication facilities shall be provided for <br />emergency purposes. <br /> <br />(25) Security. A gate shall be provided at the entrance to the site and kept locked when <br />an attendant is not on duty. <br /> <br />(26) Hau! Roads. An all-weather haul road shall be provided to the unloading area and <br />watered on a regular basis. The Landfill shall pave the access roads from T.H. 169 to the <br />scale and from T.H. 169 to the shop building by June 30, 1997 to reduce dust generation. <br /> <br />(27) Adequate Equipment. Adequate equipment shall be supplied capable of spreading <br />and compacting the refuse as received. At least one machine capable of covering the <br />working face, in its entirety at the end of the day, shall be supplied. <br /> <br />(28) I'nformatlon Display. Subject to approval by the City Council, the Licensee shall <br />,~-eeeet-mm~ maintain at each entrance to the Landfill Property a sign staling the name of <br />the facility, the schedule of days and hours the facility is open to the public, prices for use <br />of the facility, the Minnesota Pollution Control Agency permit number and the penalty for <br />nonconforming dumping. <br /> <br />(29) Screenin_a. Visual screening of the Sanitary Landfill site, as required by the <br />Conditional Use Permit for the Landfill Property and as approved by the City Council, <br />shall be provided by the use of buffer zones, natural objects, trees, plants, seeded soil <br />berms, fences, and other suitable means. <br /> <br />(30) Small-Load Durnpin_~ Site. The Licensee shall, during all hours of operation, <br />maintain and operate a separate suitable and satb disposal area for the dumping of small <br />loads by pickup trucks, cars, and trailers dom May I to October 31 each year. This <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.