My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. SR 05-19-1997
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1997
>
05/19/1997
>
6.1. SR 05-19-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:50 AM
Creation date
8/5/2003 8:39:34 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/19/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 <br /> <br />(10) <br /> <br />(11) <br /> <br />(12) <br /> <br />Traffic <br /> <br />ao <br /> <br />Except for localized jobs, traffic through Elk River <br />associated with this operation shall be limited to U.S. <br />Highway 10 and 169. Haul trucks shall not be allowed to <br />make right turns onto 225th Ave. when exiting the <br />property. <br /> <br />Dust Control <br /> <br />A permit from MPCA regarding air emissions shall be <br />obtained when required and particulate emission <br />standards shall be met by the operation. <br /> <br />bo <br /> <br />All equipment shall be located as to reduce dust to <br />adjacent properties. <br /> <br />C° <br /> <br />Water, but no chemical agents, shall be used to control <br />dust as necessary. <br /> <br />do <br /> <br />The City reserves the right to require additional <br />measures to be taken, if warranted by dust problems, <br />including but not limited to reducing stock pile heights, <br />requiring routine sweeping of US Trunk Highway 169 at <br />its intersection with 225th Ave. and temporarily closing <br />the facility. <br /> <br />Hours of Operation <br /> <br />All mineral excavation, processing, and sales activities shall be <br />conducted between the normal hours of 7:00 a.m. and 7:00 p.m., <br />Monday through Saturday with the following exception: <br /> <br />Crushing may take place twenty-four hour a day for a maximum <br />of 25 days per year, provided that this operation does not <br />unreasonable annoy adjacent property owners. Problems <br />arising from the extended hours (including, but not limited to, <br />dust, traffic, glares, noise, etc.) shall first be directed to <br />Bauerly's for resolution, then to city staff if need be, and finally <br />to the Planning Commission and City Council of the City of Elk <br />River (with public hearing) to determine if the extended hours <br />shall be revoked. <br /> <br />\\elkriver\sys\shrdoc\b&z\stever\gravcup2.doc <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.