My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1 PCSR 12-14-2010
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2010
>
12-14-2010
>
5.1 PCSR 12-14-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2010 3:16:19 PM
Creation date
12/10/2010 2:47:29 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
12/14/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
beneficial reuse. The site is located in an area that has been identified <br />as containing high quality aggregate reserves and as such was included <br />in the City of Elk River's 1994 Gravel Mining District Environmental <br />Impact Statement'. The site was subsequently included in the Mineral <br />Extraction Overlay District as indicated on the current City of Elk River <br />Zoning Map. The site will serve the growing needs of Elk River and the <br />surrounding area. <br />5.) Estimated time required to complete the proposed extraction and <br />rehabilitation: <br />Active mining will occur in phases. Site reclamation will also occur in <br />phases as feasible. It is estimated that the overall site will be active for <br />approximately 20 to 50 years. This is an estimate based on current and <br />recent past market demand. The actual life of the facility will depend <br />upon future market conditions. <br />6.) Transportation Routes: <br />Existing access to and from the site is on 217t" Ave. NW, a private road <br />running through Outlot B of Aggregate Commercial (a recorded plat). <br />There is a northbound right turn lane and a south bound left turn lane <br />currently in place from U.S. Highway 169 to 217t" Ave. NW. Tiller has <br />been in touch with MN/DOT to discuss truck access to U.S. Highway <br />169. MN/DOT has suggested certain improvements to better <br />accommodate truck access to U.S. Highway 169. Tiller will continue to <br />work with MN/DOT to explore access options and/or improvements to <br />US Highway 169. These access options or improvements will be <br />implemented before any product or materials are hauled from the site. <br />7.) Specifications for the following using appropriate maps, photographs and <br />surveys: <br />a) Physical relationship of site with respect to the community. <br />The site is located approximately 1.25 miles south of the Elk <br />River/Livonia Township boundary. Figure 1, Location Map, illustrates <br />the location of the site with respect to the City of Elk River. <br />b) Site analysis information such as trees, depth of topsoil, adjacent <br />and on-site buildings and land uses, flood levels, water courses, and <br />elevation and percent slope within 100 feet beyond perimeter of the <br />site. <br />Environmental Impact Statement, Elk River Gravel Mining District ,Elk River, Minnesota. Final <br />EIS. Citv of Elk River. Mav 1994 <br />Tiller Corporation Page ~ 2 <br />Conditional Use Permit Application <br />August 30, 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.