Laserfiche WebLink
Elk River Public Works Facility Master Planning Study <br />Alternatives <br />Section Introduction <br />Work that the City may choose to include in the project costs. <br />Relocate Softball Field Costs <br />(280' Field) Lump Sum $200,000 - $300,000 <br />Softball Field pricing is based on the following systems: <br />- Fencing at perimeter <br />- Moderate site grading/soils correction <br />- Turf outfield, dirt infield <br />- Home & away covered dugouts benches <br />- Well/irrigation system <br />- Does not include site acquisition <br />- Does not include field lighting <br />Lighting Ballfield Costs <br />(Two Fields) Lump Sum $250,000 - $275,000 <br />Lighting pricing is based on the following: <br />- 50/30 Footcandles <br />- Concrete bases <br />- Galvanized steel poles <br />- Underground electrical feeds <br />ELKRI113859 <br />~~ 100 North 6th Street 12/06/10 <br />-/-~- Minneapolis, MN 55403 <br />SE}{ 612.758.6700 <br />