Laserfiche WebLink
Elk River Public Works Facility Master Planning Study <br />Project Estimate of Probable Costs <br />Section Introduction <br />Building cost is based on the following energy efficient materials/systems: <br />- Precast wall panels at Garage spaces <br />- CMU at Office/Maintenance/Shop spaces, interior walls <br />- EPDM roof over metal deck steel bar joists/columns <br />- Gas fired roof top mechanical units, ground source heat pumps <br />Office/Maintenance Areas Square Feet <br />- 1.0 Wash Bay 1,770 <br />- 2.0 Maintenance 5,000 <br />- 3.0 Shops 2,800 <br />- 4.0 Offices 5,050 <br /> 14,620SF x <br />Vehicle Garage Areas Square Feet <br />- 1.0 Large 37,133 <br />- 2.0 Small 20,595 <br />57,728SF x <br />New Building Construction Cost <br />(includes Contractor fees) <br />$130-$150/SF = $1,900,600 - $2,193,000 <br />$95-$115/SF = $5,484,160 - $6,638,720 <br />$7,384,760 - $8,831,720 <br />Site pricing is based on the following systems: <br />- Relocating salt storage structure <br />-Fencing & landscape screening between Material Storage and playfields to the East <br />- 17,000square yards new pavement (7,SOOsquare yards of existing pavement to remain in place) <br />Site Development Costs <br />- 1.0 Civil Lump Sum $705,000 <br />- 2.0 Fuel Island, removal and new above ground tanks, station Lump Sum $175,000 <br />Soft Costs <br />- 1.0 Legal fees, geotechnical, permits, design fees 7% $578,533 - $679,820 <br />- 2.0 Construction Staking 2% $14,100 <br />Construction Contingency <br />(amount is typically reduced as project proceeds and additional information 10% $826,476 - $971,172 <br />developed) <br />Total Estimate of Probable Project Cost $9,683,869 - $11,376,812 <br />(based on RS Means 2010 Data) <br />Total Square Feet -Scheme A2 72,348 $134 - 157/SF <br />ELKRI 113859 <br />,~/ 100 North 6th Street 12/06/10 <br />-~-~ Minneapolis, MN 55403 <br />SEH 612.758.6700 <br />