My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. SR 12-13-2010
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2010
>
12-13-2010
>
5.1. SR 12-13-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2010 9:19:26 AM
Creation date
12/10/2010 9:18:39 AM
Metadata
Fields
Template:
City Government
type
SR
date
12/13/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Acres <br />Focused Area Study Suggested Phasing (millions) Opened <br /> Improvement of intersection of <br /> 171st and Twin Lakes Road, <br />Phase 1 improvement of Twin Lakes $2.1 29 <br /> Road, to the first intersection <br /> to the south. <br /> Extension of Twin Lakes Road <br />Phase 2 to the southern and eastern $2.4 81 <br /> boundary of the City property. <br /> Extension of Twin Lakes Road <br />Phase 3 to the intersection with $2 9 75 <br /> Highway 10, but not the actual <br /> intersection. <br /> Completion of local road <br />Phase 4 network on west side of $3.35 86 <br /> Highway 10, plus completion <br /> of Twin Lakes Road to 165th. <br /> Connection with a signalized <br />Phase 5 at-grade intersection at 168th $1.11 0 <br /> Avenue and TH 10. <br />Phase 6 Completion of Interchange at $35.5 0 <br /> 168th Avenue and TH 10 <br />The completion of each of these segments includes many subparts, including: <br /> Step (per phase, unless noted) Time Cost <br /> Preliminary Engineering Study 2-3 months $15-20,000 <br />x <br />o <br />Environmental review <br />~ EAW (per phase) 9-12 months $50,000 <br /> AUAR (complete project) 12 months (all project) $150,000 <br /> Final Design/ permitting 6 months 8-10% of project <br /> Grading 2 months Varies, See <br />~ <br />o Attached Estimate <br />~~ Varies, See <br /> Utility construction 5 months Attached Estimate <br />:~ <br />0 <br />U Varies, See <br /> Street Construction 2 months Attached Estimate <br />N:\Public Bodies\City Council\Council RCA\Agenda Packet\12-13-10\FAST Joint EDA CC.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.