Laserfiche WebLink
Priority #3 <br /> East Hwy. 10 <br />Deve lopment/Re development <br /> <br />Redevelop the East Highway 10 Corridor <br /> <br />d' Establish the criteria for identification of redevelopment areas within <br /> and outside the Urban Service Boundary along east Highway 10 <br />V' Identify and prioritize these east Highway 10 redevelopment areas <br />d' Establish a plan to redevelop and market each of these prioritized <br /> areas coordinating efforts with the proposed transportation corridor <br /> connecting County Roads 12/13 and Highway 10 <br />,/ Inventory property owners within these redevelopment areas and <br /> discuss possible "Joint Development Agreements", and other <br /> cooperative efforts which could be undertaken to aid in <br /> development of these areas <br />,/ Establish a long term design and land use plan which might include <br /> establishing a uniform design theme for the overall area utilizing <br /> some of the elements of the central business district Focus Study <br /> (when completed) <br /> <br /> <br />