My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.5. SR 12-06-2010
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2010
>
12-06-2010
>
5.5. SR 12-06-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2010 9:45:52 AM
Creation date
12/3/2010 9:42:09 AM
Metadata
Fields
Template:
City Government
type
SR
date
12/6/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The build out will include 26 classrooms, a cafeteria, admilustrative offices, gymnasium/ locker rooms, <br />and a kitchen. <br />Capacity of the school has been set at 525 students and will eventually include grades 6-12. Initially, 310 <br />students are expected for the 2011-2012 school ~~ar. <br />Parking. <br />Parking requirements for schools are based on the t~~e of schools. For junior high schools, the parking <br />requirement is 2 spaces per classroom. For senior high schools, parking is one space per 3 students, plus <br />1 per classroom. Based on the expected capacity, and the breakdown of classes, the parking requirement <br />is 137 spaces, as summarized in the chart below. <br />._ __ _ _ _ <br />Spectrum High School Parking requirements <br />Zunior 6 75.0 4 8 <br />Junior <br />_~... 7 <br />,._.... 75.0 <br />.. r......... <br />. 3 6 <br />Junior <br />____ 8 75.0 <br />_ . ~ ~.. <br />._a _ ~ 4 <br />_ ._ ... 8 <br />High school 9 <br />__ 75 0 25 <br />_ 3 3 <br />High school 10 <br />~ ~ _75.0 _ 25 4 _ 4 <br />High school 11 7 <br />5.0 <br />25 ' <br />4 <br />4 <br />High school 12 75 25 4 4 <br /> 525.0 100 26 37 <br />525 <br />2 per cl assroom <br />2 pe r cl assroom <br />.,.. <br />2 per cl assroom <br />1/3 students + 1 <br />1/3 students + 1 <br />-... <br />1/3 students + 1 <br />1/3 students + 1 <br />_. , . ~. _..__._. ,Totals aces ~ ~ ... __. _ __~ .. -_. _... <br />._._. __,. ...,.._... p ,_..~.~._.required 137 <br />Total spaces,provided 138 <br />26 classrooms <br />_ _ __ <br />r cl ass room <br />~r cl ass room <br />rclass room <br />~r class room <br />Because this parking breakdown is based on an equal distribution of classes, and the Spectrum <br />implemented capacityof 525, staff suggests two parking related conditions: Limiting capacityto 525 <br />students, and no parking shall be permitted on adjacent public streets. <br />Design criteria. The only exterior changes include the 13,000 square foot gymnasium addition. This <br />addition will be built with precast concrete tilt up panels. While this is different that the main building, <br />the colors will be consistent, and pre cast tilt up panels are a permitted material in the Business Park <br />zoning district. <br />Site improvements. In addition to the building addition, the school proposes a soccer field on the <br />south side of the building, south of the parking lot. The field is not proposed to be lit. A portion of the <br />field falls below a UPA easement. Typically, yards and open space are permitted under easements; we are <br />waiting for verification from the easement holder. Staff suggests a condition to address this: Written <br />verification that a sports field is permitted in the easement. <br />Other site improvements include expansion of the parking lot to accommodate the necessary 138 parking <br />stalls. <br />N:\Depaztmenu\ComT,»,n;tyDevelopment\Planniiig\Case Files\CCJP\CU 10-22 Spectnun\CU 10.22 Spectrum sRto PC 11-9-10.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.