Laserfiche WebLink
Mr. Steve Ach <br />April 14, 1997 <br />Page Two <br /> <br />5. No project specification was submitted with the plan sheet. A project <br /> specification should be prepared, submitted, and reviewed prior to any <br /> construction taking place. <br /> <br />6. The plans should include a signature box for the City to indicate approval once <br /> the changes are made. <br /> <br />7. A preconstruction meeting needs to be organized by the Developer's Engineer <br /> before any construction takes place. <br /> <br />If you have any questions regarding these comments, please call. <br /> <br />Sincerely, <br /> <br />MSA, CONSULTING ENGINEERS <br /> <br />Terry J. Maurer, P.E. <br /> <br />TJM:kh <br />354-1407.apr <br /> <br />cc: Mr. Terry Herman, John Oliver & Associates <br /> <br /> <br />