My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1. SR 04-21-1997
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1997
>
04/21/1997
>
7.1. SR 04-21-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:48 AM
Creation date
7/31/2003 8:06:42 PM
Metadata
Fields
Template:
City Government
type
SR
date
4/21/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 7 <br /> <br />Co <br /> <br />Fuel tanks shall be above ground, properly diked (if <br />required by law), and registered with MPCA. <br /> <br />do <br /> <br />All incidences that have the potential to adversely affect <br />groundwater, including but not limited to spills, shall be <br />verbally reported to the City within 24 hours. This verbal <br />notification shall be followed up in writing within 4 <br />working days. <br /> <br />A water appropriation permit from the Department of <br />Natural Resources must be obtained. <br /> <br />The wells located at the Julius Nemeth residence, the <br />scale house and the wash operation, shall be monitored <br />once a year for diesel range organics (DRO). If mining is <br />to occur below the water table, the above wells must be <br />monitored for DRO prior to excavation activities <br />commencing and after their cessation. Further, in the <br />event of a spill, appropriate water tests will be taken until <br />the spill is deemed clean. <br /> <br />go <br /> <br />Groundwater levels shall be monitored in the wells <br />located at the Julius Nemeth residence, the scale house, <br />and the wash operation, prior to the start of wash <br />operations and an additional 3 times during the first <br />week of said operation to predict the long term effects of <br />the pump operation. Thereafter, the aforementioned <br />wells shall be tested a minimum of twice per month, said <br />frequency to be increased during dry periods. This <br />routine testing shall also be done for the water recycling <br />pond. <br /> <br />ho <br /> <br />Water usage by mining activities shall not adversely <br />affect adjacent wells. Mitigative measures may include, <br />but are not limited to, curtailing of pumping activities <br />until water levels return. <br /> <br />The appropriate storm water permits shall be obtained by <br />the operator from MPCA. <br /> <br />(19) <br /> <br />Signage for the gravel and ready mix plant shall be allowed as <br />per the I-2 zone. Further, no bill boards are allowed on the <br />subject property. <br /> <br />(20) The entrance and loop road around the ready mix plant shall be <br /> hardsurfaced as approved by staff <br /> <br />s:kb&z\steverkgravcup.doc <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.