My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.8. SR 04-21-1997
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1997
>
04/21/1997
>
5.8. SR 04-21-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:48 AM
Creation date
7/31/2003 8:05:36 PM
Metadata
Fields
Template:
City Government
type
SR
date
4/21/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TH169 CORRIDOR PUBLIC PARTICIPATION MEETING MINUTES (Continued) <br /> <br />to take longer to cross because it is not square. Terry answered that it is not square <br />because of the much higher traffic volume on the west side on School Street due to Elk <br />Park Center. Two left tums onto School Street from TH169 causes the geometrics to be <br />different on all four lengths of the intersection. He indicated that this could not be <br />changed. Mr. Cruz went on to indicate that the amount of traffic now, and future traffic, <br />is a major concern. The best thing to do would be to put an overpass over TH169. He <br />felt that the amount of traffic makes it tough for pedestrian crossing at the intersection. <br />He also indicated that his daughter is a school crossing guard and he is concerned with <br />her crossing the highway. If he is not available to pick her up after school, he does not <br />allow her to perform her duties as a school guard. Suggests a pedestrian bridge be built <br />?~.soon as possible. <br /> <br />Jeanie Williams, 19041 Zane Street NW - she agreed with Tom Cruz's comments. She <br />is not happy with MnDOT's comments regarding the crossing. She wants a safe place <br />to cross without getting stuck on the island at the intersections. <br /> <br />Sue Schoemaker, 11106 190th Avenue NW - she commented that MnDOT's test of the <br />time to cross the signal last fall was not realistic. Having people out there with orange <br />vests on and MnDOT trucks around did not model the real event. Regardless of what the <br />MnDOT experiment showed, she does not feel that the crossing is safe. She stated that <br />MnDOT is concerned about moving traffic and not necessarily concerned about the lives <br />of the residents of Elk River. <br /> <br />Joel Rademacher, 11224 190th Avenue NW - he stated that being a second driver in the <br />line at School Street, the light is green and then is yellow by the time he gets to the <br />intersection. The timing is off and it should be checked. <br /> <br /> Tom Cruz, 11146 190th Avenue NW - he is concerned about the article that appeared in <br /> [ the paper that stated that one in four cars are running red lights. Terry commented that <br /> , MnDOT has indicated that at any given time, 20 percent, of the timing on their traffic <br />"." signals CoUld be in error. When the public sees a s'ituation, as indicated' by Joel <br /> Rademacher, they should call either City Hall or MnDOT and MnDOT will check it out. <br /> <br />Mike Twaddle, 18994 Zane Street NW - he stated that the number of existing residential <br />units on the east side of the highway and the potential for a significant increase number <br />in them in the near future, along with all the business interests, schools and pedestrian <br />pathways on the west side makes safety for pedestrians crossing .the highway a top <br />priority. He stated that he did not know how to correctly cross at the at grade crossing <br />until MnDOT explained it. He wondered how we could expect the children to know how <br />to cross it. He realizes that we will need to educate through parents, school, and police <br />force. He stated that we have to fence the right-of-way even though he would like to see <br />a pedestrian bridge. He felt that without the fence, there would be no way to funnel the <br /> <br />230/347-2411 .feb 3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.