Laserfiche WebLink
12. HOW WILL THE SUCCESS OF THIS PROJECT BE EVALUATED? <br /> Success will be evaluated by a visible reduction in the erosion <br />along the Mississippi River bank in the downtown area. <br /> <br />13. DESCPJBE HOW OPERA.ON AND ~%LqrNTENANCE WILL BE PER3ORMED. <br />(IF APPLICABLE) <br /> <br /> The City will monitor the area and perform brush control as <br />necessary along the rip rap. <br /> <br />14. WOULD PARTIAL FUNDING OF TI-lIS FUNDING REQUEST BE SUITABLE AND <br />ACCEPTABLE FOR TI{IS PROJECT? <br /> <br /> The City is offering to fund 50% of the construction cost as <br />was done in 1991 and 1994 ' <br /> <br />-3- <br /> <br /> <br />