My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. SR 11-15-2010
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2010
>
11-15-2010
>
5.1. SR 11-15-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2010 10:11:23 AM
Creation date
11/5/2010 1:39:23 PM
Metadata
Fields
Template:
City Government
type
SR
date
11/9/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The build out will include 26 classrooms, a cafeteria, administrative offices, gymnasium/ locker rooms, <br />and a kitchen. <br />Capacity of the school has been set at 525 students and will eventually include grades 6-12. Initially, 310 <br />students are expected for the 2011-2012 school year. <br />Parking. <br />Parking requirements for schools are based on the type of schools. For junior high schools, the parking <br />requirement is 2 spaces per classroom. For senior high schools, parking is one space per 3 students, plus <br />1 per classroom Based on the expected capacity, and the breakdown of classes, the parking requirement <br />is 137 spaces, as summarized in the chart below. <br />Spectrum High School Parking requirements <br />nior 6 ' 75.0' 4 8 <br />nior 7 75.0 3 6 <br />nior 8 75.0 4 8 <br />hschool 9 <br />_ _ 75.0 25 3` <br />_ - 3 <br />__ <br />gh school '. 10 <br />_..~. 75.0 25 4 4 <br />gh school <br />....... ... 11 <br />....._.._.. 75.0- 25 4 <br />_.... 4 <br />v...~, _. <br />gh school 12 75 25 4' 4 <br /> 525.0! 1001 26 37 <br />Total spaces required 137 <br />_. <br />Total spaces provided 138 <br />525 26 classrooms <br />Because this parking breakdown is based on an equal distribution of classes, and the Spectrum <br />implemented capacity of 525, staff suggests two parking related conditions: Limiting capacity to 525 <br />students, and no parking shall be permitted on adjacent public streets. <br />Design criteria. The only exterior changes include the 13,000 square foot gymnasium addition. This <br />addition will be built with precast concrete tilt up panels. While this is different that the main building, <br />the colors will be consistent, and pre cast tilt up panels are a permitted material in the Business Park <br />zoning district. <br />Site improvements. In addition to the building addition, the school proposes a soccer field on the <br />south side of the building, south of the parking lot. The field is not proposed to be lit. A portion of the <br />field falls below a IJPA easement. Typically, yards and open space are pernitted under easements; we are <br />waiting for verification from the easement holder. Staff suggests a condition to address this: Written <br />verification that a sports field is permitted in the easement. <br />Other site improvements include expansion of the parking lot to accommodate the necessary 138 parking <br />stalls. <br />N:\Depatttr~nts\CommunityDevelopment\Planning\Case Files\C[JP\CU 10-22 Speanun\CU 10-22 Spectrum SRto PC 11-9-10.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.