Laserfiche WebLink
Number of Employees <br />There are a total of 31 employees including faculty and staff. <br />„ ~ ~~- ,: , <br />Student Population <br />There will be 310 students for the 2011 - 2012 school year. The facility is being designed <br />for a maximum of 525 students. That number includes the future addition of grades 6-8 (7 <br />grade levels with 75 students at each level). <br />Site <br />As noted above, the site is approximately 6.4 acres with a pond and wetland along the <br />north property line. A double loaded aisle of parking surrounds the building on three <br />sides and along the north side there is additional angled parking (staff only) and a one <br />way drive with a drop off area. To accommodate bus circulation, the drive along the <br />northwest corner of the building is being widened. This will require a small amount of <br />grading into the drainage easement, but should not impact the wetland. A new 12' x 15' <br />trash enclosure will be provided near the southwest corner of the building. Additional <br />recycling area will be provided inside the building. A plaza will be created along the <br />north side of the addition allowing for outdoor classroom activities. A new soccer field <br />will be built along the south side of the property. <br />Parking Summary <br />Required parking <br />Grades 10-12 (225 students) 1 stall per 3 students 75 stalls <br />Grades 10-12 (10 classrooms) 1 stall per classroom 10 stalls <br />Grades 6-9 (12 classrooms) 2 per classroom 24 stalls <br />Total parking required 109 stalls <br />Total parking provided <br />137 stalls <br />Signage <br />It is anticipated that there will be a sign on the building and a new monument sign. These <br />elements are currently being designed and have not been submitted with this application. <br />We would request that approval be given for a monument sign and a building sign based <br />on meeting all pertinent zoning regulations and approval by staff at a later date. <br />Building Materials <br />The exterior materials of the existing building are a combination of EIFS (at the <br />entrances), decorative concrete block (main portion of walls) and decorative concrete <br />brick (accent bands). The new gymnasium exterior walls will be exposed aggregate <br />precast panels that will coordinate with the existing color scheme. Bands cast into the <br />precast panels will be painted to match the bands on the existing walls. The prefinished <br />metal coping at the top of the precast walls will match the existing coping. The parapet of <br />the new walls will step up approximately two feet above the height of the existing walls. <br />Because of the geometry of the building and the fact that the site is on an outside corner <br />of the business park, the view of the addition will be mostly blocked from the street. <br />