Laserfiche WebLink
Priority #3 <br /> East Hwy. 10 <br />Deve 1 opm ent/Re d eve 1 opment <br /> <br />Redevelop the East Highway 10 Corridor <br /> <br />Establish the criteria for identification of redevelopment areas within <br />and outside the Urban Service Boundary along east Highway 10 <br />Identify and prioritize these east Highway 10 redevelopment areas <br />Establish a plan to redevelop and market each of these prioritized <br />areas coordinating efforts with the proposed transportation corridor <br />connecting County Roads 12/13 and Highway 10 <br />Inventory property owners within these redevelopment areas and <br />discuss possible "Joint Development Agreements", and other <br />cooperative efforts which could be undertaken to aid in <br />development of these areas <br />Establish a long term design and land use plan which might include <br />establishing a uniform design theme for the overall area utilizing <br />some of the elements of the central business district Focus Study <br />(when completed) <br /> <br /> <br />