Laserfiche WebLink
Planning Commission Minutes Page 11 <br />July 23, 1996 <br /> <br />ALL COMMENTS OUTLINED IN TERRY MAURER'S MEMO DATED JULY 17, 1996, <br />BE INCORPORATED'INTO THE PLAT FOR APPROVAL. <br /> <br />APPROPRIATE DRAINAGE AND UTILITY EASEMENTS BE PROVIDED <br />THROUGHOUT THE PLAT. <br /> <br />A SIX FOOT WIDE SIDEWALK BE INSTALLED ALONG HIGHLAND ROAD FROM <br />JACKSON TO THE PLATS WESTERN LIMITS. <br /> <br />PARK DEDICATION IN THE AMOUNT REQUIRED BY THE CITY AT THE TIME OF <br />FINAL PLAT BE PAID PRIOR TO RELEASING THE PLAT FOR RECORDING. <br /> <br />o <br /> <br />PAYMENT OF THE SURFACE WATER MANAGEMENT FEE BE PAID PRIOR TO <br />RELEASING THE PLAT FOR RECORDING. <br /> <br />THE DEVELOPER SIGN A PETITION FOR CITY WATER AND SEWER, WAIVING <br />THEIR RIGHT TO OBJECTION FOR ASSESSMENTS. <br /> <br />COMMISSIONER KUESTER SECONDED THE MOTION. THE MOTION CARRIED 5-1, <br />COMMISSIONER TACHENY OPPOSED. <br /> <br /> COMMISSIONER KUESTER MOVED THE PLANNING COMMISSION RECOMMEND <br /> APPROVAL OF THE CONDITIONAL USE PERMIT FOR SITE PLAN APPROVAL REQUESTED <br /> BY DERRICK INVESTMENT CORP., PUBLIC HEARING CASE NO. CU 96-19, WITH THE <br /> FOLLOWING CONDITIONS: <br /> <br />1. THE REZONING AND PLAT BE APPROVED BY THE PLANNING COMMISSION <br /> AND CITY COUNCIL. <br /> <br />2. COMMENTS FROM TERRY MAURER'S MEMO DATED JULY 17, 1996, BE <br /> INCORPORATED INTO THE PLANS. <br /> <br /> THE REZONING AND PLAT BE APPROVED BY THE PLANNING COMMISSION <br /> AND CITY COUNCIL. <br /> <br /> ALL COMMENTS FROM TERRY MAURER'S MEMO DATED JULY 17, 1996, BE <br /> INCORPORATED INTO THE PLANS. <br /> <br />5. THE MAIN DRIVEWAY THROUGHOUT THE PROJECT HAVE A ROADWAY <br /> WIDTH OF 30 FEET. <br /> <br />6. ALL OF THE SECONDARY ROADS OFF OF THE MAIN DRIVEWAY HAVE A <br /> MINIMUM WIDTH OF 20 FEET. <br /> <br /> DRIVEWAYS THAT ACCESS DIRECTLY ONTO THE MAIN ROAD HAVE THEIR <br /> WIDTH NARROWED DOWN TO AS NARROW A WIDTH AS POSSIBLE. <br /> <br />8. A MINIMUM DISTANCE OF 22 FEET BE MAINTAINED BETWEEN THE GARAGE <br /> AND ANY DRIVEWAY. <br /> <br />9. CONCRETE CURB AND GUTTER BE PROVIDED THROUGHOUT THE ENTIRE <br /> PROJECT. STAFF WOULD LIKE TO DISCUSS THE SPECIFIC LOCATIONS WITH <br /> <br />0 <br /> <br /> <br />