My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.3. SR 10-18-2010
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2010
>
10-18-2010
>
3.3. SR 10-18-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2010 3:52:09 PM
Creation date
10/14/2010 3:52:08 PM
Metadata
Fields
Template:
City Government
type
SR
date
10/18/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAY ESTIMATE NO. 2 -FINAL <br />COMPLETION DATE AMOUNT OF CONTRACT <br />FROM: September 11, 2010 ORIGINAL: 09/30/10 ORIGINAL: $38,652.36 <br />TO: September 30, 2010 REVISED: REVISED: <br />PROJECT: 182nd Avenue Storm Sewer Improvements CONTRACTOR: Brenteson Companies, Inc. <br />ADDRESS: P.O. Box 335, Big Lake, MN 55309 <br />OWNER: CITY OF ELK RIVER PHONE: (763) 263-3100 <br />FAX: (763) 241-1798 <br />CONTRACT ITEMS THIS PERIOD TOTAL TO DATE <br />ITEM DESCRIPTION UNIT QTY. UNIT QTY AMOUNT QTY AMOUNT <br />NO. TOTAL PRICE <br />R(`FiFI)7 ii F 1 O _ RTRF.FT <br />1 MOBILIZATION LS <br />2 REMOVE CONCRETE CURB LF <br />3 REMOVE CONCRETE WALK SF <br />4 REMOVE CONCRETE PAVEMENT SY <br />5 REMOVE BITUMINOUS PAVEMENT SY <br />6 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LF <br />7 SALVAGE AGGREGATE CY <br />8 AGGREGATE BASE CLASS 5 (LV) CY <br />9 MILL BTTUMINOUS SURFACE Q.5") SY <br />10 TYPE MV3 WEAR COURSE MIXTURE (MVWE35035B) TON <br />11 TYPE LV3 NON-WEARING COURSE MIXTURE (LVNW35030B) TON <br />12 BITUMINOUS MATERIAL FOR TACK COAT GAL <br />13 ADJUST FRAME AND RING CASTING EACH <br />14 4" CONCRETE SIDEWALK SF <br />15 CONCRETE CURB AND GUTTER 28" SURMOUNTABLE LF <br />16 8" CONCRETE VALLEY GUTTER SY <br />17 8" CONCRETE VALLEY GUTTER TRIANGULAR SECTION EACH <br />18 TRUNCATED DOMES (PEDESTRIAN CURB RAMP) EACH <br />19 TRAFFIC CONTROL LS <br />20 INLET PROTECTION EACH <br />Pay Estimate 182nd St Storm No 2.~ds 1 OF 2 <br />1.00 $ 2,407.19 <br />108 $ 9.00 <br />68 $ 0.77 <br />21.4 $ 0.62 <br />371 $ 1.48 <br />232 $ 3.50 <br />136.0 $ 0.85 <br />45 $ 13.45 <br />113 $ 8.80 <br />47 $ 115.50 <br />47 $ no.oo <br />20 $ 6.05 <br />3 $ 311.00 <br />68 $ 5.50 <br />to8 $ 27.50 <br />5 $ 60.50 <br />2 $ 550.00 <br />1 $ 550.00 <br />l.oo $ sao.oo <br />6 $ 285.30 <br />0.00 $0.00 <br />0.00 $0.00 <br />0.00 $0.00 <br />0.00 $0.00 <br />0.00 $0.00 <br />0.00 $0.00 <br />0.00 $0.00 <br />13.00 $174.85 <br />10.00 $88.00 <br />0.00 $0.00 <br />0.00 $0.00 <br />0.00 $0.00 <br />0.00 $0.00 <br />0.00 $0.00 <br />0.00 $0.00 <br />0.00 $0.00 <br />0.00 $0.00 <br />0.00 $0.00 <br />0.00 $0.00 <br />0.00 $0.00 <br />1.00 $2,407.19 <br />191 $1,719.00 <br />98 $75.46 <br />6.7 $4.15 <br />371 $549.08 <br />215 $752.50 <br />0 $0.00 <br />81 $1,089.45 <br />75 $660.00 <br />40.41 $4,667.36 <br />45.07 $4,957.70 <br />12 $72.60 <br />3 $933.00 <br />98 $539.00 <br />191 $5,252.50 <br />6.7 $40535 <br />2 $1,100.00 <br />1 $550.00 <br />1.00 $880.00 <br />5 $1,426.50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.