Laserfiche WebLink
15 ' 118/97 The slructural engineer wilt be notified P RSP, ~ricksen Roed, ~_,ily ol 1/20/97 An actual site visit will be required to verify if <br /> today regarding snow depth on the Elk River ASAP any snow removal should occur. Also, lhere <br /> existing roof. ~s a concern about ice damage to the roof <br /> and any roof top equipment. <br />16 1/8i~/ The city issued a I~mporary occupancy P Cily of Elk River, all 1/13/97 Need emergency lighting i'~ lhe existing arena <br /> ~permil on Monday, January 20, 1997. A Conlractors restored. Some sprinkler work done, the <br /> Iisi of correclions was sent lo all subs bleachers installed. <br /> previously. <br />17 1122/97 Reliance Elect~ic's $900.00+ cost for P RSP 1129/97 RSP will review whether or nol the eteclrical <br /> relocatin9 panels, engineer will be responsible for Ibis cost. <br />18 1122/97" Two flues damaged b~ ice on the roof P Horwitz, Shaw 1/29/97 Horwitz' sheet melal co~traci~ will need to <br /> need to be repaired (1) and another work alongside the roofing contraclor. <br /> removed at the existing roof. <br />19 1122/97 The next meeling will be at 2:00-p.m. on I All 1129t97 <br /> Wednesday, January 29, 1997. <br /> <br />Attendees: <br />Pat Klaers, City of Elk River <br />Tim, Rink Systems <br />Rich Czech, Elk River Arena <br />Kelly Johnson, Reliance Electric <br />Richard Gallatin, Shaw-Lundquisl <br />Cliff Skogstad, City of Elk River <br />Pal Barnetl, M. A. Mortenson Company <br />Courtney Kuch, RSP Architects <br /> <br />Copies sent to: <br />Dale Marlin, Hockey Association <br />Lori Johnson, City of Elk River <br />Jim Schuweiler, Shaw-Lundquisl <br />Steve Snyder, S.A.F_E. <br />Brad Lemberg, I.C.E. <br />Bill Schiferli,-Horwitz <br />Gene Krieger, Arena Systems <br />Stacey Overgaard, Rink Systems <br /> <br />Page 3 <br /> <br /> <br />