Laserfiche WebLink
o <br /> <br />10. <br /> <br />11. <br /> <br />12. <br /> <br />13. <br /> <br />14. <br /> <br />15. <br /> <br />EXHIBIT B <br /> <br />ALL COMMENTS OUTLINED IN TERRY MAURER'S MEMO DATED JANUARY 17, 1997 BE <br />INCORPORATED INTO APPROVAL OF THE FINAL PLAT. <br /> <br />VEHICLE ACCESS TO THE PROPOSED PLAT BE LIMITED TO THREE DRIVEWAYS, ALL <br />OCCURRING ON FREEPORT AVENUE. NO ACCESS WILL BE ALLOWED TO LOT 1, <br />BLOCK 1 DIRECTLY FROM SCHOOL STREET. <br /> <br />CROSS ACCESS AND CROSS PARKING AGREEMENTS WILL NEED TO BE PROVIDED <br />FOR THE SHARED DRIVEWAY AND PARKING ARRANGEMENTS PROPOSED ON THE <br />PLAT. <br /> <br />ADDITIONAL DRAINAGE AND UTILITY EASEMENTS TO COVER THE PROPOSED STORM <br />WATER MANAGEMENT PONDS WILL NEED TO BE REFLECTED ON THE FINAL PLAT. <br /> <br />THE EXISTING SCHOOL ADMINISTRATION BUILDING WILL NEED TO BE REMOVED <br />ALONG WITH ALL EXISTING UTILITIES PROPERLY CAPPED OR REMOVED PRIOR TO <br />CONSTRUCTION COMMENCING ON LOT 1, BLOCK 1. <br /> <br />A NPDES PERMIT WILL NEED TO BE OBTAINED PRIOR TO COMMENCING ANY <br />GRADING ON SITE. <br /> <br />A GRADING AND DEVELOPMENT PLAN WILL NEED TO BE APPROVED BY THE CITY <br />ENGINEER PRIOR TO COMMENCING GRADING. <br /> <br />GRADING IN MN/DOT RIGHT OF WAY WILL REQUIRE A PERMIT. THIS MUST BE <br />OBTAINED AND A COPY PRESENTED TO THE CITY PRIOR TO COMMENCING WORK. <br /> <br />GRADING OF THE PLAT WILL NEED TO BE COMPLETED PRIOR TO OR IN <br />CONJUNCTION WITH DEVELOPMENT OF THE FIRST BUILDING CONSTRUCTED WITHIN <br />THE PLAT. <br /> <br />A SURFACE WATER MANAGEMENT FEE WILL NEED TO BE PAID PRIOR TO RELEASING <br />THE FINAL PLAT FOR RECORDING. <br /> <br />PARK DEDICATION WILL NEED TO BE PAID PRIOR TO THE RELEASE OF THE FINAL PLAT <br />FOR RECORDING. <br /> <br />A WATER AVAILABILITY CHARGE WILL NEED TO BE PAID TO ELK RIVER MUNICIPAL <br />UTILITIES IN THE AMOUNT OF $300 PER LOT. VERIFICATION OF THIS PAYMENT MUST BE <br />PROVIDED TO THE CITY PRIOR TO RELEASING THE FINAL PLAT FOR RECORDING. <br /> <br />ALL OUTSTANDING ENGINEERING AND LEGAL FEES WILL NEED TO BE PAID PRIOR TO <br />RELEASING THE FINAL PLAT FOR RECORDING. <br /> <br />ANY IMPROVEMENTS MADE WITHIN A DRAINAGE AND UTILITY EASEMENT SHALL BE <br />SUBJECT TO REMOVAL AT THE PROPERTY OWNER'S EXPENSE IF ANY UTILITY WORK <br />NEEDS TO BE DONE WITHIN THE EASEMENT. <br /> <br />AN EASEMENT DOCUMENT BE PREPARED COVERING THE EXISTING SIDEWALK ALONG <br />SCHOOL STREET. THIS EASEMENT WILL NEED TO BE EXECUTED AND RECORDED <br />ALONG WITH THE FINAL PLAT. <br /> <br />s:XdocumentXresolutionXp96-11.doc <br /> <br /> <br />