Laserfiche WebLink
Elk River City Council Meeting <br />January 21, 1997 <br /> <br />Page 9 <br /> <br />COUNCILMEMBER DIETZ MOVED TO APPROVE THE PRELIMINARY PLAT FOR HEYING <br />ADDITION, SUBDIVIDING APPROXIMATELY 4.9 ACRES INTO FOUR COMMERCIAL LOTS <br />WITH THE FOLLOWING CONDITIONS: <br /> <br />ALL COMMENTS OUTLINED IN TERRY MAURER'S MEMO DATED JANUARY 17, <br />1997 BE INCORPORATED INTO APPROVAL OF THE FINAL PLAT. <br /> <br />VEHICLE ACCESS TO THE PROPOSED PLAT BE LIMITED TO THREE DRIVEWAYS, <br />ALL OCCURRING ON FREEPORT AVENUE IN ACCORDANCE WITH THE <br />CONCEPT PLAN FOR THE HEYING ADDITION DATED 12/11/96. NO ACCESS <br />WILL BE ALLOWED TO LOT 1, BLOCK 1 DIRECTLY FROM SCHOOL STREET. <br /> <br />o <br /> <br />CROSS ACCESS AND CROSS PARKING AGREEMENTS WILL NEED TO BE <br />PROVIDED FOR THE SHARED DRIVEWAY AND PARKING ARRANGEMENTS <br />PROPOSED ON THE PLAT. <br /> <br />ADDITIONAL DRAINAGE AND UTILITY EASEMENTS TO COVER THE PROPOSED <br />STORM WATER MANAGEMENT PONDS WILL NEED TO BE REFLECTED ON THE <br />FINAL PLAT. <br /> <br />o <br /> <br />THE EXISTING SCHOOL ADMINISTRATION BUILDING WILL NEED TO BE <br />REMOVED ALONG WITH ALL EXISTING UTILITIES PROPERLY CAPPED OR <br />REMOVED PRIOR TO CONSTRUCTION COMMENCING ON LOT 1, BLOCK 1. <br /> <br />o <br /> <br />A NPDES PERMIT WILL NEED TO BE OBTAINED PRIOR TO COMMENCING ANY <br />GRADING ON SITE. <br /> <br />o <br /> <br />A GRADING AND DEVELOPMENT PLAN WILL NEED TO BE APPROVED BY THE <br />CITY ENGINEER PRIOR TO COMMENCING GRADING. <br /> <br />J <br /> <br />GRADING IN MN/DOT RIGHT OF WAY WILL REQUIRE A PERMIT. THIS MUST BE <br />OBTAINED AND A COPY PRESENTED TO THE CITY PRIOR TO COMMENCING <br />WORK. <br /> <br />GRADING OF THE PLAT WILL NEED TO BE COMPLETED PRIOR TO OR IN <br />CONJUNCTION WITH DEVELOPMENT OF THE FIRST BUILDING CONSTRUCTED <br />WITHIN THE PLAT. <br /> <br />10. <br /> <br />A SURFACE WATER MANAGEMENT FEE WILL NEED TO BE PAID PRIOR TO <br />RELEASING THE FINAL PLAT FOR RECORDING. <br /> <br />11. <br /> <br />PARK DEDICATION WILL NEED TO BE PAID PRIOR TO THE RELEASE OF THE <br />FINAL PLAT FOR RECORDING. <br /> <br />12. <br /> <br />A WATER AVAILABILITY CHARGE WILL NEED TO BE PAID TO ELK RIVER <br />MUNICIPAL UTILITIES IN THE AMOUNT OF $300 PER LOT. VERIFICATION OF <br />THIS PAYMENT MUST BE PROVIDED TO THE CITY PRIOR TO RELEASING THE <br />FINAL PLAT FOR RECORDING. <br /> <br />13. <br /> <br />ALL OUTSTANDING ENGINEERING AND LEGAL FEES WILL NEED TO BE PAID <br />PRIOR TO RELEASING THE FINAL PLAT FOR RECORDING. <br /> <br /> <br />