Laserfiche WebLink
6 12/18t96 Roof ventilalion and fans will be wired off P Reliance ....1113/97 Schedule with Rich Czech to minimize <br /> the new ice. hockey disruption. One roof unit has been <br /> wired. <br />7 10t30t96 D.M.J. presented a request for a change P Shaw 12131/96 Shaw provided revised pii~ing from DMJ <br /> order to pave the south area. tota~in~l less than $10,0~0.00. <br />8 10t2196 prOpoSal Request No. 4 from RSP to alt P RSP 12124t96 RSP issued draWing f'(~r reloCation of <br /> contractors. Structural working with dehumidifier and moving off the ice area this <br /> Vulcrafl Io finalize added angles, week. Hocwitz & Shaw Io relocate by 1/7/97. <br />9 1112719'6 New gate at existing rink. Review P Shaw 113197 -The gate will be instal'led by Rink Syslems <br /> logistics o( this work along with concrete, next week and the concrete work will .follow. <br /> stairs by the new steel stairs at existing The existing wood separation can be kept in <br /> bleachers. Gate scheduled to'be as a separation for the new concrete to keep <br /> ~nslalled !12/97. the rink operational. <br />10 1213~)96 Operator for coiling door al zamboni R ' Shaw, City of Elk River 12/31/96 City approved $850.00 to install operators on <br /> too m. site. <br /> <br />11 11113/96 New stairs fr'~)r~ mezzanine. ' .... P RSP ASAP Review storage r°~m lay(~u! aflei stairs are <br /> inslalled. May need to infili w:,th drywall. <br /> Review patching precast cut outs & bleacher <br /> supporls. RSP provided a drawing. <br /> <br />12 11/13196 Future locker room layout. Drawing P RSP ASAP RSP will review the mechanical design for the <br /> given to Rich Czech by RSP on 11/17/96. locker rooms and submil to the hockey <br /> The Hockey Association has contracted association Io assist them in deciding on the <br /> directly with RSP to provide mechanical most economical system for the locker room <br /> and electrical de..sicjn, in the I_on~l range. <br /> <br />13 ' 12/t 8/9-6 ,Verily il [here is a Freon leak detector P Rink Systems, Cily of Elk 1/6/97 Cliff Skogstad requested, the specification <br /> ,included with the skid package' or control River, RSP information on the R22 coolant in order to <br /> package? verify code requirer~enls for evacuation of the <br /> chemicals'. <br /> <br />14 12/18t96 Radiant heating at east bleachers. P Ho~Vitz 1117197 Approved to proceed. Refurbishing <br /> ,underway, installation will be off the ice. <br /> <br />Page 2 <br /> <br /> <br />