Laserfiche WebLink
for the lowering of the water level between November and April then allowing the water to <br />recharge to the higher elevations through the spring and summer months. This will be <br />accomplished by placing a valve on the pipe we are proposing to install on the outlet control <br />structure. This valve will be closed at the beginning of April of every year to allow the level <br />in the pond to recharge to the 897.10 elevation. The yearly pond recharge will be dependent <br />on rainfall received in the spring and summer months. If rainfall amounts during the spring <br />and summer are small, the water level in the basin may not reach the 897.10 elevation. <br />The City street crews will be completing the modification to the outlet control structure with <br />materials already on hand. Please call with any questions you have on the corrections <br />addressed above. <br />Enclosure <br />C:\Documents and Settings\XPMUser\Local Settings\Temporary Internet Files\OLK66\182nd Avenue Storm Sewer and Pond <br />Level.doc <br />