Laserfiche WebLink
Case File No. CCJ 10-19 Elk River Lutheran Much <br />September 14, ?010 <br />Page 2 <br />Analysis <br />The applicants propose using the space for no more than 5 years, during which time they will build a <br />permanent structure somewhere in Elk River. With this time frame proposed, staff can support the use <br />of the parcel for non-commercial uses. Long term, staff anticipates the viability of the shopping center to <br />increase, or the property drastically redeveloped; dul7rlg either, non-commercial uses would be <br />inappropriate. <br />FINANCIAL IMPACT <br />None <br />ATTACHMENTS <br />^ Applicants narrative <br />^ Location map <br />^ Floor plan (A 101, dated 8-4-2010) <br />Action Motion by Second by Vote <br />Follow Up <br />N:\Depaztments\CommuniryDevelopment\P~anni a\Case Files\CUP\CU 10-19 ERLutheran Chu~h\Staff report of PC RE IUP 9-14-10.doc <br />