My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.3 PAY ESTIMATES 09-20-2010
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2010
>
09-20-2010
>
3.3 PAY ESTIMATES 09-20-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2010 11:13:54 AM
Creation date
9/17/2010 11:13:54 AM
Metadata
Fields
Template:
City Government
type
SR
date
9/20/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAY ESTIMATE N0.2 <br />COMPLETION DATE AMOUNT OF CONTRACT <br />FROM: August 1, 2010 ORIGINAL: 08/30110 ORIGINAL: $443,874.70 <br />T0: August 31, 2010 REVISED: REVISED: <br />PROJECT: 2010 Main Street Pavement CONTRACTOR: RUM RIVER CONTRACTING CO. <br />Rehabilitation ADDRESS: 31913124TH ST., PRINCETON, MN 55371 <br />OWNER: CITY OF ELK RIVER PHONE: (763) 389-3718 <br />FAX: (763) 389-3213 <br />CONTRACT ITEMS THIS PERIOD TOTAL TO DATE <br />ITEM DESCRIPTION UN[T QTl'. UNIT QTY AAIOUNT QTY AMOUNT <br />N0. TOTAL PRICE <br />ervcnrn c f n eTDCCT <br />I M08ILIZATION LS <br />2 REMOVE CONCRETE CURB LF <br />3 REh[OVE CONCRETE WALK SF <br />4 REh[OVE CONCRETE DRIVEWAY PAVEMENT 5Y <br />5 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LF <br />G SALVAGESIGN EACH <br />7 SUBGRADE PREPARATION RD ST <br />8 FULL DEPTH PAVEMENT RECLAMATION (P) SY <br />9 M[LL HffUMIN0U5 SURFACE (2,0") SY <br />10 TYPE MV3 WEAR COURSE hID{TURE (MVWE35035B} TON <br />l 1 TYPE LV3 NON-WEARING COURSE MLYTURE (LVNW35030B) TON <br />12 BITUMINOUS h1ATERIAL FOR TACK COAT GAL <br />13 ADJUST VALVE BOX EACH <br />14 ADJUST FRAA7E AND RING CAST~IG EACH <br />15 INSTALL CASTING (R-2591-C) EACH <br />IG 4"CONCRETESiDEWALK SF <br />l7 CONCRETE CURB AND GUTTER B618 LF <br />l8 8" CONCRETE VALLEY GUTTER SY' <br />19 8"CONCRETE VALLEY GUTTER TRIANGULAR SECTION EACH <br />20 TRUNCATED DOMES (PEDESTRIAN CURB RAMP} EACH <br />21 TRAFFIC CONTROL ~ <br />22 INSTALL SIGN IN CONCRETE EACH <br />23 4" SOLD LINE WHITE -EPOXY LF <br />24 4" DOUBLE SOLID LINE YELLOW -EPOXY LF <br />2S 4"BROKEN LINE YELLOW -EPOXY LF <br />26 24" SOLID WHITE (STOP BAR) -EPOXY LF <br />27 3'X6' ZEBRA CROSSING WHITE -EPOXY SP <br />1.00 $ 6,000.00 <br />440 $ 3.00 <br />2,551 $ 1.50 <br />7.7 $ 10.00 <br />86 $ 3.00 <br />4 $ 50,00 <br />64.1 $ zoo.oo <br />29,572 $ 0.95 <br />410 $ 5.50 <br />3,800 $ 44.34 <br />3,800 $ 43.00 <br />1,553 $ 2.50 <br />21 $ 185.00 <br />21 $ 373.00 <br />I $ 495.00 <br />2,884 $ 3.10 <br />440 $ 14.20 <br />5.0 $ 54,00 <br />4 $ 500.00 <br />17 $ 256.00 <br />1.00 $ 3,000.00 <br />3 $ 200.00 <br />5,284 $ 0.28 <br />3,341 $ 0.58 <br />2,810 $ 0.06 <br />170 $ 6.00 <br />972 $ 3.00 <br />0.0 $0.00 <br />0.0 $0.00 <br />o.a $o.ao <br />o.o $o.oa <br />86.0 $258.00 <br />0.0 $0.00 <br />0.0 $0.00 <br />o.o $o.oo <br />96.0 $528.00 <br />3,299.87 $146,316.24 <br />0.0 $0.00 <br />1,550.0 $3,875.00 <br />0.0 $0.00 <br />0.0 $0.00 <br />0.0 $0.00 <br />265.0 $821.50 <br />o.a $0.00 <br />0.0 $0.00 <br />0.0 $0.00 <br />1.0 $256.00 <br />0.5 $1,500.00 <br />1.0 $200.00 <br />5,370.0 $1,503.60 <br />3,250.0 $1,885.00 <br />582.0 $34.92 <br />169.0 $1,014.00 <br />936.0 $2,808.00 <br />1.0 <br />477.0 <br />2,185.0 <br />43.9 <br />86.0 <br />1.0 <br />61.4 <br />29,572.0 <br />96.0 <br />3,299.9 <br />3,685.6 <br />1,SSOA <br />18.0 <br />20.0 <br />1.0 <br />3,050.0 <br />471.0 <br />7.0 <br />4.0 <br />t 9.0 <br />1.0 <br />l.0 <br />5,370.0 <br />3,250.0 <br />582.0 <br />169.0 <br />936.0 <br />Pay Estimate 2010 main street no 2.xls I OF 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.