Laserfiche WebLink
~. Impementatian Pragram <br />This chapter Presents an outline of the implementation program far starting the process of <br />de~Feloping the Elk River Landf 11 Park. This chapter has three sections. <br />Project Phasing: Identifies the various projects and tasks to be implemented. <br />Project Cost: Identifies unit costs for each item and provides approximate <br />preliminary construction cost estimate,. <br />Project Funding: Lists potential funding sources for implementing the specific <br />project. <br />~. Project Phasing <br />There are six phases to this project and the starting of each phase is based on the landfill <br />activities. In addition, fluctuation of the final grades and length of the landfill operation <br />will determine the viability of each pr©ject. Some projects may overlap or implemented <br />concurrently while in some instances, as need and funding arise, projects may need to be <br />advanced or delayed. <br />1. Phase 1. <br />• Review and reconstruct, if necessary, the entrance road to comply ~.tith <br />roadway safety regulations, due to increase traffic to the park <br />• Mill and overlay access road and parking Tots to the Research Center. <br />• Reconstruct parking lots <br />• Renovate Research Center for year round use and for visitor center use. <br />• Develop archery ranch at north end of Research Center in the wooded area. <br />• Develop detention pond as a natural amenity to the park. <br />+ Install plantings per recommendation. <br />Z. Phase 2 <br />• Develop hill slope nearest to the Research Center as sledding hill <br />• Install a portable towrope for winter sledding use. <br />• Install plantings per recommendation <br />• Construct gravel trail <br />• Construct overlooks <br />• Develop detention pond as a natural amenity to the park <br />3. Phase 3 <br />• Extend trail and overlooks <br />• Install plantings per recommendation <br />• Connect trail to the existing trail along the west edge of the property. <br />• Develop detention pond as a natural amenity. <br />f <br />4. Phase 4 <br />., • Extend trail to complete looping trail at the top of landfill <br />• install plantings per recommendation. <br />' E!k R~•er Land6fI End Ilse I1lastcr Plan ~(j URS <br />!)'ante ~fanagemenf, lnc. SepEemtler 2IXlZ <br />