Laserfiche WebLink
City Council Nfinutes <br />June 16, 2003 <br /> <br /> 2. NO MORE THAN A TOTAL OF 55 STUDENTS ARE TO BE <br /> ENROLLED. <br /> <br />Page 5 <br /> <br />IF THE LOCATION OF THE PLAY AREA IS MOVED, THE <br />APPLICANT SHALL APPLY FOR AN AMENDMENT TO THE <br />CONDITIONAL USE PERMIT. <br /> <br />4. CLIENTS SHALL ABIDE BY THE DROP-OFF AND PICK-UP <br /> SCHEDULE SET BY THE OPERATOR. <br /> <br />APPLICANT SHALL PLACE PAVEMENT MARKINGS, CONES, <br />AND SIGNAGE ANNOUNCING CHILDREN CROSSING AT <br />THE REAR OF THE BUILDING TO THE PLAY AREA. <br /> <br />6. MAINTAIN STATE LICENSE. <br /> <br />COUNCILMEMBER KUESTER SECONDED THE MOTION. THE <br />MOTION CARRIED 5-0. <br /> <br />6.3. <br /> <br />Request by Trails End Holdings-Elk River, LLC (STM Development.) for a Conditional Use <br />Permit for 7,000 sq. ft. Retail Building, Public Hearing-Case No. CU 03-12 <br /> <br />Staff report submitted by Senor Planner Scott Harlicker. Mr. Harlicker stated that the <br />applicant is requesting a conditional use permit for a 7,000 square foot auto parts store. He <br />discussed zoning, parking, building design standards, landscaping, signage, and Planning <br />Commission action. <br /> <br />Mayor Kdinzing opened the public hearing. There being no one to speak to this issue, Mayor <br />IGinzing closed the public hearing. <br /> <br />Mayor Klinzing stated concerns about access onto Zane Street. She stated that traffic along <br />Zane Street (coming from Home Depot and Wal-mart) makes it difficult to pull onto Zane <br />Street. <br /> <br />Councilmember Motin-stated that he is concerned with customers servicing their vehicles in <br />the parking lot. <br /> <br />Lynn Sutherland, STM Development - Stated that they do not allow repairs to be made in <br />their parking lots. He discussed changes made to the exterior of the building. <br /> <br />COUNCILMEMBER MOTIN MOVED TO APPROVE THE CONDITIONAL <br />USE PERMIT FOR AN AUTO PARTS STORE WITH THE FOLLOWING <br />CONDITIONS: <br /> <br />FOUR FOOT HIGH WAINSCOTING SHALL BE INCLUDED ON THE <br />MIDDLE SECTION OF THE NORTH AND SOUTH ELEVATIONS. <br />THE MATERIAL SHALL MATCH THE MATERIAL OF THE <br />PILASTERS. <br /> <br /> <br />