Laserfiche WebLink
<br />~oward R. Green Company <br />May 19, 2003 <br />File: 820870J-0240 <br /> <br />Mr. Scott Harlicker <br />Senior Planner <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, MN 55330 <br /> <br />RE: AUTO PARTS STORE SITE PLAN REVIEW <br />LOT 2, ELK RIVER CROSSING 3RD ADDITION <br /> <br />Dear Mr. Harlicker: <br /> <br />As requested, we have reviewed the submittal for the proposed auto parts store on Lot 2, Block 1, Elk <br />River Crossing 3rd Addition. The submittal was prepared by John Oliver and Associates and dated <br />April 25, 2003. It consisted of a preliminary site plan, preliminary grading plan, preliminary utility plan, <br />and a preliminary landscape plan. Based on our review and comments received at the site plan <br />review, we would offer the following comments: <br /> <br />1. The intent for all of the sites along Trunk Highway 169 in Elk River Crossing was to <br />maintain an open corridor behind all of the buildings. This site has a proposed dumpster <br />located at the rear of the building that would prohibit vehicle traffic from one site to the <br />other. The dumpster location should be moved to the north or south side of the building. <br />2. We have reviewed the Panera Bread site plan to the south and verified the abutting <br />elevations. We have also reviewed the Sterling Bank approval to the north. It appears that <br />the elevations shown on the north line are different than those in the approved Sterling <br />Bank site plan. The grading plan needs to match the approved Sterling Bank plan to the <br />north. <br />3. This site will likely need to apply for an NPDES permit prior to any work on the site. <br />4. The fire chief has asked for a hydrant to be located internal to the site. The location he has <br />chosen is the island at the northeast corner of the building. <br />5. Show United Power Association easement along Trunk Highway 169 frontage. <br /> <br />If you have any questions regarding any of these comments, please call. <br /> <br />Sincerely, <br /> <br />Howard R. Green Company <br /> <br />~ <br />g/2Uj ))1/ 'Uicl:/~) <br /> <br />Terry J. ~a~rer, P.E. <br /> <br />T JM:sw <br /> <br />Ltr-051403-Leeseberg <br />1326 Energy Park Drive 0 St. Paul, MN 55108 0 651/644-4389 fax 651/644-9446 toll free 888/368-4389 <br />