My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. ERMUSR 09-15-2010
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2010
>
09-15-2010
>
6.1. ERMUSR 09-15-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2010 1:01:58 PM
Creation date
9/10/2010 1:00:57 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
9/15/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River ---~ <br />Municipal Utilities <br />13069 Orono Parkway • P.O. Box 430 <br />Elk River, MN 55330-0430 <br />UTILITIES COMMISSION MEETING <br />Phone: 763.441.2020 <br />Fax: 763.441.8099 <br />TO: FROM: <br />Elk River Municipal Utilities Commission Mark Fuchs <br />John Dietz, Chair Line Superintendent <br />Jeny Gumphrey, Vice Chair <br />D 1 Thom son, Trustee <br />MEETING DATE: AGENDA ITEM NUMBER: <br />Se tember 15, 2010 6.1 <br />SUBJECT: <br />Staff U dates <br />Discussion: <br />• On Sunday August 29th a squirrel got into a three phase riser pole by Fairview Clinic on <br />Main St. causing an azc flash. There are multi-feeders on this section of the line. The <br />fault current was so high it caused the wires to hit each other and caused the high side <br />breaker at the substation to open. <br />• Installed a single phase primary loop between 300 3rd and 340 3rd Street apartments. <br />• Installed three security lights at Hillside Park on County Road 12. Jeff Beahen had <br />requested them because oFproblems they were having out there. <br />• Continued working on 1st and 2nd Street rebuild. <br />• Continued working on Area 22 rebuild. <br />• Continue working on Engers Addition rebuild. <br />• Had one new application For electric service. <br />• We received the new Vermeer Vactron. <br />• We have been trying out new track plow machines from Ditch Witch, Vermeer and <br />Astec. Restoration time is much less with the track plow machine (see attached photos). <br />• We sent two linemen down to Marshall for MMUA substation school. <br />• I went to the MMUA annual summer meeting with Troy in Alexandria. We heazd about <br />the implications of new environmental regulations that may affect our power plant and <br />how these regulations will have to be met by 2013. Had a session on 800 MHZ two way <br />radios and found ways to use our existing system with the new one. Saw some of the new <br />technology for renewable photovoltaic energy and storage. Had a legislation update on <br />which laws have passed and which ones have not. Also discussed which direction the <br />electrical industry seems to be headed in. I thought it was a very good meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.