My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.2. & 6.3. SR 05-19-2003
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2003
>
05/19/2003
>
6.2. & 6.3. SR 05-19-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:40 AM
Creation date
5/16/2003 7:36:59 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/19/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 6 <br /> <br />(~6) <br /> <br />(17) <br /> <br />cannot be viewed from adjacent properties or is totally <br />screened. <br /> <br />Mining activities shall not cause excessive vibration off site. <br />If excessive vibration becomes an issue, the City reserves the <br />right to take appropriate measures to alleviate the problem. <br /> <br />Groundwater protection measures shall include: <br /> <br />ao <br /> <br />bo <br /> <br />Co <br /> <br />do <br /> <br />go <br /> <br />ho <br /> <br />The Operator shall file with the City an Emergency <br />Spill Prevention and Counter Control Plan and a <br />Storm Water Pollution Prevention Plan as may be <br />required by other governmental entities. The Operator <br />shall adhere to these plans in the event there is a spill. <br /> <br />The Operator shall provide the Fire Department with a <br />copy of their flammable or hazardous materials. <br /> <br />Fuel tanks shall be above ground, properly diked (if <br />required by law), and registered with MPCA. <br /> <br />All incidences that have the potential to adversely <br />affect groundwater, including but not limited to spills, <br />shall be verbally reported to the City within 24 hours. <br />This verbal notification shall be followed up in writing <br />within four (4) working days. <br /> <br />The appropriate storm water permits (NPDES) shall be <br />obtained by the Operator from MPCA and copied to the <br />City. <br /> <br />Mining activities shall not take place closer to ground <br />water levels than indicated in the plans submitted <br />without amending this conditional use permit. <br /> <br />Gravel washing operations are prohibited at this site <br />and will require an amendment to this permit to be <br />allowed in the future. <br /> <br />Except for minor repairs, maintenance of vehicles and <br />equipment shall take place in the shop at the Elk River <br />Bituminous site. The Operator shall have an approved <br />hazardous waste license for this facility and properly <br />dispose of all waste. <br /> <br />s: \b&z \ stever \gravcup.doc <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.