My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.2. & 6.3. SR 05-19-2003
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2003
>
05/19/2003
>
6.2. & 6.3. SR 05-19-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:40 AM
Creation date
5/16/2003 7:36:59 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/19/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 <br /> <br />(10) <br /> <br />(11) <br /> <br />eo <br /> <br />Traffic <br /> <br />ao <br /> <br />Contours, finished grades, details of erosion control <br />methods, and settling ponds, shall comply with the <br />plans submitted and the City ordinance at the time of <br />reclamation. Additional measure as determined by <br />city staff may be required. <br /> <br />bo <br /> <br />Co <br /> <br />Material mined as part of this Operation shall be haul <br />directly to the Elk River Bituminous site via <br />easements, not accessing any public road. Access to <br />Highway 169 at 219th Avenue will be eliminated when <br />frontage roads leading to interchanges are developed. <br /> <br />All portions of drives shared by this Operation and <br />another business or residence shall be a minimum of <br />twenty feet wide and hard surfaced. The Operator <br />shall provide the City with executed copies of all <br />agreements concerning the ability to make <br />improvements to these drives and their maintenance <br />prior to the Operation commencing. <br /> <br />The sale of product from the Operation shall only take <br />place from the Elk River Bituminous site and then only <br />after receiving authorization from the Minnesota <br />Department of Transportation and completing all <br />required improvements to the access for that site prior <br />to commencing said sales. <br /> <br />Dust Control <br /> <br />ao <br /> <br />bo <br /> <br />co <br /> <br />A permit from MPCA regarding air emissions shall be <br />obtained when required and particulate emission <br />standards shall be met by the Operation. This permit <br />and all other correspondence between the Operator <br />and MPCA shall be copied to the City. <br /> <br />All equipment shall be located as to reduce dust to <br />adjacent properties. <br /> <br />A water truck shall be on site at all times when mining <br />activities are taking place to control dust as necessary. <br />Chemicals shall not be use for dust control. <br /> <br />s: \b&z\stever\gravcup.doc <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.