My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-28-2010 CCM SPECIAL
ElkRiver
>
City Government
>
City Council
>
Council Minutes
>
City Council 1974 - Present
>
2010-2019
>
2010
>
06-28-2010 CCM SPECIAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2010 10:14:29 AM
Creation date
7/21/2010 10:14:28 AM
Metadata
Fields
Template:
City Government
type
CCM
date
6/28/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Minutes Page 2 <br />June 28, ZO10 <br />----------------------------- <br />4.2. Main Street Pavement Rehabilitation Project, Improvement & Assessment Public Hearings <br />A. Resolution Orderin the Im rovement • <br />B. Resolution Adotiting Final Assessment Roll <br />C. Resolution Accepting Bid and Authorizing Execution of Contract <br />John Anderson, P.E. with BDM Consulting Engineers, presented the staff report and <br />provided a PowerPoint presentation. He noted a correction on page 5 of the presentation and <br />stated two properties should be removed as they were assessed in 2003. <br />Mayor Klinzing stated she would combine both public hearings and opened both public <br />hearings. <br />Joe & Kara Homan, 1028 Main Street, presented council with photographs of a cement <br />retaining wall in front of their property, stating the wall is on city property. The roots of an <br />oak tree has grown into the wall and is causing the cement to split and become pushed out, <br />causing a dangerous setting. <br />Mr. Anderson stated this is out of the scope of this rehabilitation project, but after some <br />discussion, it was decided to take a look at the wall during the project and obtain bids for <br />cement work. <br />Peggy Kaproth, 1305 Main Street, asked questions regarding the criteria for doing a full <br />depth reclamation and whose decision it was to make. She stated there is an unused driveway <br />on her property that the city actually uses to access sewer lines and requested that this <br />driveway not be elinunated. • <br />Jim MacGibbon, PID #75-409-0740, asked when the last reclamation had been completed <br />on Main Street and asked if there were any guarantee how long this one would last and when <br />the next assessment would occur. <br />Mr. Anderson stated the last reclamation was done in 1988. He stated it would be hard to <br />place a guarantee timeframe of how long this reclamation would last, but said approximately <br />20-30 years depending on use of the road. <br />Mr. MacGibbon stated one of his lots is considered unbuildable. <br />Mayor Klinzing stated he should provide a hand written note to the council indicating his <br />objection to the assessment. Mr. MacGibbon provided council with his objection. <br />George Valasquez, 1912 Main Street, asked questions regarding when the last assessment <br />occurred and if some properties would be excluded from assessments. He had concerns with <br />the use of the road by heavy trucks and wondered if there should be a weight limit. He <br />requested a stop sign be placed at County Road 30 and Main Street to control speed. He also <br />had concerns with neighbors who are on fixed incomes and who may not be able to attend <br />tonight's meeting to express their thoughts. <br />Mr. Anderson stated engineers do recognize the heavy use of the road and will use a thicker <br />pavement section to accommodate the extra weight and traffic. He noted that stop signs <br />generally don't help with speed control. He outlined the process that took place to notify and <br />inform residents of a potential assessment, stating the city follows laws that are set forth by • <br />the state. <br />
The URL can be used to link to this page
Your browser does not support the video tag.