Laserfiche WebLink
REQUEST FOR ACTION <br />TO ITEM NUMBER <br />Ma or and Ci Council 7.4. <br />AGENDA SECTION MEETING DATE PREPARED BY <br />Administration ul 19, 2010 Phil Hals, Street Su erintendent <br />ITEM DESCRIPTION REVIEWED By <br />Retaining Wall on Main Street East of Norfolk Avenue <br /> REVIEWED BY <br />ACTION REQUESTED <br />Provide guidance for staff regarding inclusion of this wall with the-Main Street Paving Project. <br />BACKGROUND/DISCUSSION <br />At the public hearing, several residents expressed interest in having this retaining wall replaced as part of <br />the Main Street Paving Project. Several of the lot corners have been located and most, if not all, of the <br />wall is within the street right-of--way. <br />FINANCIAL IMPACT <br />Engineer's estimate to remove and replace the 230 foot retaining wall with a similar cast in place concrete <br />retaining wall is $ 70,598.00. Engineer's estimate to remove and replace the 230 foot wall with a modular <br />block wall is $ 25,960.00. The contractor for the Main Street Project has a very aggressive schedule which <br />would require that the wall be completed by August 2, 2010 so that the work is done prior to the final lift <br />of asphalt paving. <br />ATTACHMENTS <br />^ Engineer's estimate of costs to replace the existing retaining wall. <br />ACtIOn Motion by Second by Vote <br />FOllow Up <br />C:\Documents and Settings\XPMUsex\Local Settings\Tempoxary Internet Files\OLK66\7-19-10 MC Action Request Council Guidance on <br />Retaining Wall.doc <br />