Laserfiche WebLink
Ms. Michele McPherson <br />August 31, 2001 <br />Page Two <br /> <br />The storm sewer shown on the preliminary grading plan is different than the storm sewer <br />shown on the preliminary landscape plan. We believe that the preliminary grading plan is <br />correct. Therefore, the preliminary landscape plan should be revised to reflect the correct <br />storm sewer alignment. <br /> <br />Since the entire site is void of trees, additional grading should be shown where necessary to <br />ensure that drainage from one lot to the other follows the drainage and utility easements <br />around the perimeter of the lots. <br /> <br />The preliminary grading plan does reflect a two-foot high berm along the frontage with CSAH <br />35. <br /> <br />C. Miscellaneous <br /> <br />Pascal Street is currently a gravel roadway. We would recommend that as a condition of the <br />plat, the developer pave Pascal Street approximately 325 feet from CSAH 35 to the <br />intersection of the entrance to the plat. <br /> <br />If you have any questions regarding any of these comments, please call. <br />Sincerely, <br /> <br />Howard R. Green Company <br /> <br />Terry J. Maurer, P.E. <br /> <br />Ltr-083101~McPherson.doc <br /> <br />Howard R, Green Company <br /> CONSULTING ENGINEERS <br /> <br /> <br />