Laserfiche WebLink
PROPOSED IMPROVEMENTS <br />^ Residential Areas -1, 2, 4 <br />- Bituminous Overlay - 1%:" <br />- Milling at Driveways where needed to match <br />-Aggregate Shouldering where needed <br />- Bituminous Curbing Build-Up <br />PROPOSED IMPROVEMENTS <br />^ Industrial Park-Area 3 <br />-Mix of Improvements <br />- Edge Mill & 2" Bituminous Overlay <br />- Reclaim Existing Bituminous & 4" Overlay <br />-Curb and Gutter Fill-In <br />- Storm Sewer & Catch Basins <br />PROJECT COST ESTIMATES <br /> <br /> <br /> <br />RESIDENTIAL.AREAS 1, 2, 4 $470,000 <br />INDUSTRIAL PARK AREA 3 $268,700 <br />TO"C4L ESTIMATED PROJECT COST: $738,700 <br />2 <br />