Laserfiche WebLink
The total project cost is $46,652.36 which includes the construction cost of $38,652.36, and overhead <br />cost of $8,000. The overhead cost includes preliminary engineering of $3,000 and construction related <br />engineering of $5,000. The stormwater fund has sufficient balance to fund this project. <br />Attachments <br />• Construction quotes (2) <br />• Construction Plan <br />Action Motion by Second by Vote <br />Follow Up <br />