Laserfiche WebLink
C] <br />C] <br />CONCEPT EVALUATION <br />CONCEPT ALTERNATIVE #3: <br />Pros <br />» Interchange located furthest north for <br />existing businesses and Northstar commuter <br />rail station <br />» Limited impact to existing single family <br />neighborhood <br />Cons <br />» No north/south connection f or west side o f <br />Highway ~o <br />» Signal proximity may be a problem, less than <br />preferred i/z mile spacing <br />» Extensive costs for additional bridge crossing <br />to connect to upper west side of Highway <br />io/~6g <br />» Limited development capacity at future <br />interchange location <br />~"c~ncept Alternative #3 <br />