Laserfiche WebLink
Page 5 <br />;~~~~ <br />(Ii) h'Iining activities shall not cause excessive vibration ofr" site. If <br />excessive vibration becomes an issue, the City reserves the right <br />to take appropriate measures to alleviate the problem. <br />(18) Groundwater protection measures shall include: <br />a. The operator shall file with the Cit57 an emergency- spill <br />response plan. The operator shall adhere to this plan in <br />the event there is a spill. <br />b. The operator shall provide the Fire Department v~-ith a <br />copy of their flammable or hazardous materials. <br />c. Fuel tanks shall be above ground, properly= d~~ ed (if <br />required by law), and registered a=ith I~~IPCA. <br />d. All incidences that have the potential to adversely affect <br />groundwater, including but not 1im.ited to spills, shall be <br />verbally reported to the CitST within 24 hours. This verbal <br />notification shall be followed up in writing within 4 <br />working days. <br />e. Gravel wash operations shall be prohibited on the <br />property. <br />f. RZining operations shall be conducted a minimum of five <br />(5) feet above the seasonally high water table. <br />g. The appropriate storm water permit shall be obtained by <br />the operator from MPCA. <br />{19) Fencing -The entire perimeter of the property shall be fenced. <br />(20) Screening and Buffering - INTO mining operations shall be <br />conducted within two hundred (200) feet of the property boundary. <br />Further, R-ithin this two hundred (200) foot buffer area trees shall be <br />left for screening. In open areas where trees do not exist, screening <br />shall be accomplished by the construction of a minimum six (6) foot <br />high berm planted with evergreens. <br />4.) General Provisions- <br />(Ol) Permits- Operator agrees to comply with all of the provisions <br />hereof and agrees to save and hold the City harmless from any and all <br />cupST•Ba/bzlsr <br />