My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5. EDSR 06-14-2010
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
2003-2013
>
2010
>
06-14-2010
>
5. EDSR 06-14-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2010 10:57:23 AM
Creation date
6/11/2010 10:44:42 AM
Metadata
Fields
Template:
City Government
type
EDSR
date
6/14/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />~ BacK~roun~ <br />The i7ist Avenue FAST project area offers one of the more important development and <br />redevelopment sites within the City of Elk River. With the strong orientation toward <br />Highway ioJi69 and the newly opened Northstar Commuter Rail Station in the fall of <br />zoo9, the dynamics of land use in this portion of the community are likely to evolve. <br />In order to plan for the future of the FAST, background knowledge of the study area <br />is vital in order to fully understand the potential of the site. This chapter begins with <br />an overview of exiting land use and transportation conditions describing the starting <br />point for the master plan. The chapter concludes with an analysis of the opportunities <br />and challenges of these existing conditions. <br />1 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.