Laserfiche WebLink
5 SPEC WOOD FIBER BLANKET SY 2,285.00 $1 60 0.00 $0.00 2,285.00 $3,65600 <br />6 SPEC INSTALLING CONDUIT LS 1.00 $23500 0.00 $0.00 1.00 $235.00 <br /> <br />SCHEDULE 7.0 o EXTRA WORK - TOTAL <br /> <br />SCHEDULE 8.0 - THREE LANE STRIPING OF BUSINESS CENTER DRIVF <br /> <br />$0.00 $15,385.13 <br /> <br />1 2104.501 REMOVE CONCRETE CURB AND GUTTER LF 259.00 55.00 0.00 $0.00 120.00 $600.00 <br />2 2104.503 REMOVE CONCRETE MEDIAN SF 1,141.00 $3.00 0.00 $0.00 1,233.00 $3,699.00 <br />3 2104.513 SAW BITUMINOUS PAVEMENT (FULL DEPTH) LF 150.00 $500 0.00 50.00 12.00 560.00 <br />4 2104.511 SAW CONCRETE PAVEMENT (FULL DEPTH) LF 10.00 $15.00 0.O0 $0.00 0.00 $0.00 <br />5 2104.501 REMOVE 4" SKIP STRIPING LF 1,700.00 50.65 0.00 $0.00 0.00 $0.00 <br />6 2104.501 REMOVE 4" SOLID DOUBLE STRIPING LF 2,000.00 5310 0.00 $0.00 0.00 $0.00 <br />7 2350.609 TYPE MV3 NON WEARING COURSE MIXTURE TON 11.00 $8700 0.0O $0.00 0.00 $0.00 <br />8 2350.609 TYPE MV3 WEARING COURSE MIXTURE TON 11.00 $87.00 1.34 $116.58 1.34 $116.58 <br />9 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GAL 4.50 $2.90 0.00 $0.00 0.00 $0.00 <br />10 22531.501 CONCRETE CURB AND GUTTER B618 (MEDIAN) LF 270.00 $15.00 0.00 $0.00 94.00 $1,410.00 <br />11 2531.503 CONCRETE MEDIAN SY 68.00 $31.00 0.00 $0.00 0.00 $0.00 <br />12 2531.602 CONCRETE MEDIAN NOSE DESIGN 7113A EACH 1.00 $259.00 0.00 $0.00 1.00 ' $259.00 <br />13 2564.602 FURNISH A~ID INSTALL SIGN PANELS, TYPE C SF 15725 $22.50 0.00 $0.00 0.00 $0.00 <br />14 2564.602 PAVEMENT MESSAGE (LEFT ARROW) EPOXY EACH 39.00 $11500 0.00 $0.00 0.00 $0.00 <br />15 2564.602 PAVEMENT MESSAGE (RIGHT AR ROW) EPOXY EACH 2.00 5115.00 0.00 $0.00 0.00 $0.00 <br />16 2564.602 PAVEMENT MESSAGE (THRU ARROW) EPOXY ' EACH 3.00 $85.00 0.00 $0.00 0.00 $000 <br />17 2564.603 4" SOLID LINE WHITE EPOXY LF 9,166.00 $0.35 0.00 $0.00 0.00 $0.00 <br />18 2564.603 4" BROKEN LINE WHITE EPOXY LF 1,299.00 $0.15 0.00 $0.00 0.00 $0.00 <br />19 2564.603 4" DOUBLE SOLID LINE YELLOW EPOXY LF 663.00 $0.75 0.00 $0.00 0.00 $0.00 <br />20 2564.603 4" SOLID LINE YELLOW EPOXY LF 8,075.00 $0.40 0.00 $0.00 0.00 $0.00 <br />21 2564.603 4" BROKEN LINE YELLOW EPOXY LF 7,265.00 $0.20 0.00 $0.00 0.00 $0.(30 <br />22 2564.603 24" SOLID LINE YELLOW EPOXY LF 135.00 $6.25 0.00 $0.00 0.00 $0.00 <br />23 2564.604 CROSSWALK MARKING EPOXY SF 290.00 $4.00 0.00 $0.00 0.00 $0.00 <br />24 2563.601 TRAFFIC CONTROL LS 1.00 $1,500.00 0.00 $0.00 0.00 $0.00 <br /> <br /> SCHEDULE 8.0 - THREE LANE STRIPING OF BUSINESS CENTER DRIVE-TOTAL $116.58 $6,144.58 <br /> <br /> BID SUMMARY TOTAL THiS PERIOD TOTAL TO DATE <br /> SCHEDULE 1.0 - BUSINESS CENTER DRIVE - TOTAL $62,087.64 $634,646.87 <br /> SCHEDULE 2.0 - WACO STREET - TOTAL 547,220.50 $307,827.11 <br /> SCHEDULE 3.0 . 185TH AVENUE - TOTAL $11,759.53 $85,993.62 <br /> SCHEDULE 4.0 - OLD WACO STREET - TOTAL $177.50 54,817.35 <br /> SCHEDULE S.8 - TH 18 TURN LANES - TOTAL $19,238.11 $67,226.76 <br /> SCHEDULE 6.0 - EXTENSION OF TRUNK UTIETIES - TOTAL $0.00 $106,185.65 <br /> SCHEDULE 7.0 - EXTRA WORK - TOTAL 50.00 $15,385.13 <br /> SCHEDULE 8.8 - THREE LANE STRIPING OF BUSINESS CENTER DRIVE-TOTAL $116.58 $6,144.58 <br /> <br />TOTAL BID SUMMARY THIS PERIOD <br />TOTAL BID SUMMARY TO DATE <br /> <br />$140 599.85 <br /> <br />$1,228,22706 <br /> <br />AMOUNT EARNED <br />i i;::i::iliiii::%!i!::::!::!iiiiiiiii!iiii::::i%:::C: <br />AMOUNT RETAINED <br /> <br />MATER~AL ON S~TE <br /> <br />MATERIAL DEDUCT. <br /> <br />PREVIOUS PAYMENTS <br />i li::::ii!i!~ii::i::iii::~ililili!il;"~ii::iiiiii~}iiiiiiil <br />AMOUNT DUE <br /> <br />O:~J~roj~807650~0071 \Pay Est. ~7 <br /> <br /> <br />