My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.6. PCSR 06-08-2010
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2010
>
06-08-2010
>
5.6. PCSR 06-08-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2010 11:00:21 AM
Creation date
6/4/2010 3:30:40 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
6/8/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONCEPT EVALUATION <br />• <br />developers, transportation experts from MN DOT and the Northstar Rail Authority, <br />as well as areas of expertise in public finance, market potential and energy. All panel <br />members had no vested interest in the study area and allowed for a critical outside <br />perspective on the three concept alternatives. The comments below were made by <br />panel participants and are organized by transportation, land use, amenities and finance <br />categories. <br />Comments in BOLD resonated with the group as critical elements. <br />Transportation: <br />» Reconstruction of the ion/~69 interchange as a comprehensive project will likely not happen <br />within our planning horizon (zo-3o years) due to funding realities. Alternatively, "band-aid" <br />transportation improvements necessitated by tra f fic and safety problems will be the <br />norm. <br /> » New Highway ~o interchange accessing the site is possible and would be looked at favorably by <br /> MNJDOT in order to cleanup sa f ety and tra f fic problems caused by current intersections. An <br /> interchange could happen independently o f other highway improvements. <br /> » MN/DOT will likely close additional median crossings accessing the study area from Highway <br /> ~o in the next several years to improve sa fety. It will likely limit those access points to right-in/ <br /> right-out only. <br />+~ » Northstar rail is expected to open in November zoo9. The Elk River train station is projected to <br /> have 90o riders/day. Northstar in formation is at www.mn-GetOnBoard.com <br /> » Northstar Rail is planning one morning and one evening reverse-commute train per weekday. <br /> Ridership demand may pressure more. <br /> » Studies suggest that'/, o f employees/residents in the walking zone o f an LRT station will use <br /> transit. Commuter rail capture rates will be less than LRT. <br /> » When choosing where to live, many people "drive" to the point they can a fiord. <br /> » There is some talk o f legislatively limiting or surcharging "vehicle miles traveled". This could <br /> create a market incentive for transit-oriented, compact development. <br /> Land Use: <br /> » Early in its evolution, the commuter rail station will have only a minor impact on large <br /> scale retail development in the study area but will drive relatively small amounts o f <br /> convenience retail near the station. The commuter rail station is seen as a plus for <br /> office, industrial and residential uses. <br /> » Highway and train noise is a big issue for residential development - a land use bu f fer <br /> is needed between corridors and housing. <br /> » Housing demand is built on job creation. Job creation in the study area should be key focus. The <br /> commuter train could be an o fTice/industrial marketing bonus for the study area. <br />• » FHA financing of residential development is dependent on noise levels. <br />j2 17131. 4V2r1UE' Focused Area STudy <br />
The URL can be used to link to this page
Your browser does not support the video tag.